Site work for a water / sewer project in Hamtramck, Michigan. Completed plans call for site work for a water / sewer project.

The proposed Sewer Relief Phase 1B consists of 2 phases. Phase 1 Goodson Sewer Relief- A new relief sewer consisting of 1,671 linear feet of 60-inch diameter relief sewer via open cut will be installed from the intersection of Lumpkin and Goodson east to an existing stub in the diversion chamber at Joseph Campau and Goodson. A 10-foot x 20-foot junction chamber will be installed over the existing Lumpkin sewer at the intersection of Goodson and Lumpkin. Full-depth road reconstruction HMA surface with a concrete curb, sidewalk, storm sewer, and a new 12-inch water main to be installed via directional drill within the Goodson Right-of-way from Joseph Campau to Lumpkin. Phase 1 Goodson Sewer Relief- Alternative - A new relief sewer consisting of 1,671 linear feet of 60-inch diameter relief sewer via open cut will be installed from the intersection of Lumpkin and Goodson east to an existing stub in the diversion chamber at Joseph Campau and Goodson. A 10-foot x 20-foot junction chamber will be installed over the existing Lumpkin sewer at the intersection of Goodson and Lumpkin. Full-depth road reconstruction Concrete road with integral curb and gutter, sidewalk, storm sewer, and a new 12-inch water main to be installed via directional drill within the Goodson Right-of-way from Joseph Campau to Lumpkin Phase 2 Joseph Campau Sewer Relief - A new relief sewer consisting of 1,073 linear feet of 36- inch relief sewer will be installed via open cut along Joseph Campau from the existing junction chamber at Goodson and Joseph Campau's intersection to the north, south of Lehman St. A 12-foot diameter junction chamber will be installed over the existing Joseph Campau shallow ("high egg") sewer. Full-depth road reconstruction and sidewalk replacement will be on the East side of Joseph Campau and a mill and replacement on the east side of Joseph Campau. Phase 2 Joseph Campau Sewer Relief - Alternative - A new relief sewer consisting of 1,073 linear feet of 48-inch relief sewer will be installed via directional drill along Joseph Campau from the existing junction chamber at Goodson and Joseph Campau intersection to the north, south of Lehman St. A 12-foot diameter junction chamber will be installed over the existing Joseph Campau shallow ("high egg") sewer. Full-depth road reconstruction and sidewalk replacement will be on the East side of Joseph Campau and a mill and replacement on the east side of Joseph Campau. The anticipated start date, weather permitting, is no later than July 15, 2022, and substantially completed by February 15, 2023, with final completion by February 28, 2022. All Requests for Information (RFI) are due by May 3, 2022, by 2:00 pm (EST), use the following link to submit all RFIs. electronically Responses to RFI's will be returned by May 6, 2022, by 2:00 pm (EST). Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 90 days after the bid opening date.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
344
Active Projects
162
Bidding Soon
2,712
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

July 15, 2022

Project location map

Multiple Locations, Hamtramck, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.