Site work for a water / sewer project in Hamtramck, Michigan. Completed plans call for site work for a water / sewer project.
The proposed Sewer Relief Phase 1B consists of 2 phases. Phase 1 Goodson Sewer Relief- A new relief sewer consisting of 1,671 linear feet of 60-inch diameter relief sewer via open cut will be installed from the intersection of Lumpkin and Goodson east to an existing stub in the diversion chamber at Joseph Campau and Goodson. A 10-foot x 20-foot junction chamber will be installed over the existing Lumpkin sewer at the intersection of Goodson and Lumpkin. Full-depth road reconstruction HMA surface with a concrete curb, sidewalk, storm sewer, and a new 12-inch water main to be installed via directional drill within the Goodson Right-of-way from Joseph Campau to Lumpkin. Phase 1 Goodson Sewer Relief- Alternative - A new relief sewer consisting of 1,671 linear feet of 60-inch diameter relief sewer via open cut will be installed from the intersection of Lumpkin and Goodson east to an existing stub in the diversion chamber at Joseph Campau and Goodson. A 10-foot x 20-foot junction chamber will be installed over the existing Lumpkin sewer at the intersection of Goodson and Lumpkin. Full-depth road reconstruction Concrete road with integral curb and gutter, sidewalk, storm sewer, and a new 12-inch water main to be installed via directional drill within the Goodson Right-of-way from Joseph Campau to Lumpkin Phase 2 Joseph Campau Sewer Relief - A new relief sewer consisting of 1,073 linear feet of 36- inch relief sewer will be installed via open cut along Joseph Campau from the existing junction chamber at Goodson and Joseph Campau's intersection to the north, south of Lehman St. A 12-foot diameter junction chamber will be installed over the existing Joseph Campau shallow ("high egg") sewer. Full-depth road reconstruction and sidewalk replacement will be on the East side of Joseph Campau and a mill and replacement on the east side of Joseph Campau. Phase 2 Joseph Campau Sewer Relief - Alternative - A new relief sewer consisting of 1,073 linear feet of 48-inch relief sewer will be installed via directional drill along Joseph Campau from the existing junction chamber at Goodson and Joseph Campau intersection to the north, south of Lehman St. A 12-foot diameter junction chamber will be installed over the existing Joseph Campau shallow ("high egg") sewer. Full-depth road reconstruction and sidewalk replacement will be on the East side of Joseph Campau and a mill and replacement on the east side of Joseph Campau. The anticipated start date, weather permitting, is no later than July 15, 2022, and substantially completed by February 15, 2023, with final completion by February 28, 2022. All Requests for Information (RFI) are due by May 3, 2022, by 2:00 pm (EST), use the following link to submit all RFIs. electronically Responses to RFI's will be returned by May 6, 2022, by 2:00 pm (EST). Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 90 days after the bid opening date.
Post-Bid
Water / Sewer
$2,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2022
July 15, 2022
Multiple Locations, Hamtramck, MI
Related To This Project
Hamtramck, MI
Bid Date: Apr 26 2022
Hamtramck, MI
Bid Date: Apr 01 2022
Hamtramck, MI
Bid Date: Apr 22 2021
Hamtramck, MI
--
Hamtramck, MI
Bid Date: Jul 27 2022
Hamtramck, MI
Bid Date: Dec 17 2021
Hamtramck, MI
Bid Date: Jul 27 2022
Hamtramck, MI
Bid Date: Jul 27 2022
Hamtramck, MI
Bid Date: Dec 13 2022
Hamtramck, MI
Bid Date: Dec 02 2022
Hamtramck, MI
Bid Date: Sep 29 2022
Hamtramck, MI
Bid Date: Oct 06 2022
Sterling Heights, MI
Bid Date: May 24 2022
Brandon Township, MI
Bid Date: May 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.