BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2022 at 8:00 PM

Updated March 4, 2025

Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.

Commodity Code Description 22100 Heavy construction machinery and equipment including equipment for paving and earth moving 30120 Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand 46160 Public safety and control equipment and supplies and accessories including traffic control (driver feedback signs and traffic signals) and water safety and rescue equipment and accessories and snow and ice melter and snow removal equipment and road salt 72140 Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation 83100 Utilities including gas and power and water and sewer and electricity and utilities management and consulting services, and alternative forms of energy, solar panels and servicing Work covered under this Contract, Granger-Hunter Improvement District 22C: Lake Park & Merry Lane Subdivisions Waterline Replacements shall be performed within two separate residential subdivision communities within Granger-Hunter Improvement District Service Area, identified as follows: 1. Merry Lane Subdivision - comprising: a. Merry Lane (Hunter Drive to 3500 South, including crossing of 3500 South) b. Hunter Lane (5316 W to 5194 W) c. Sunshine Drive (east from Merry Lane and terminating near the east property line of 5205 W) d. Cheerful Vista Road (Hunter Drive to Sunshine Dr) 2. Lake Park Subdivision - comprising: a. Lake Park Drive (Redwood Rd to end of road near 1881 W) There is NO waterline construction within Redwood Rd right-of-way. b. Parkcrest Drive (Lake Park Dr. to Parkway Blvd, including crossing of Parkway Blvd.) c. Lake Crest Drive d. Lake Park Circle B. The work to be performed consists of furnishing and installing the facilities and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: 1. Obtaining all permits. 2. Project supervision. 3. Mobilization/Demobilization. 4. Installation of a new waterlines, residential service, fire hydrants, valves, reconstruction of various roadway improvements removed or damaged by construction and all work as shown on the Drawings

Award

Water / Sewer

$1,984,790.00

Public - City

Site Work

37

18

4

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
75
Bidding Soon
1,031
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

July 4, 2022

Project location map

Multiple Locations, West Valley City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.