Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.
Commodity Code Description 22100 Heavy construction machinery and equipment including equipment for paving and earth moving 30120 Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand 46160 Public safety and control equipment and supplies and accessories including traffic control (driver feedback signs and traffic signals) and water safety and rescue equipment and accessories and snow and ice melter and snow removal equipment and road salt 72140 Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation 83100 Utilities including gas and power and water and sewer and electricity and utilities management and consulting services, and alternative forms of energy, solar panels and servicing Work covered under this Contract, Granger-Hunter Improvement District 22C: Lake Park & Merry Lane Subdivisions Waterline Replacements shall be performed within two separate residential subdivision communities within Granger-Hunter Improvement District Service Area, identified as follows: 1. Merry Lane Subdivision - comprising: a. Merry Lane (Hunter Drive to 3500 South, including crossing of 3500 South) b. Hunter Lane (5316 W to 5194 W) c. Sunshine Drive (east from Merry Lane and terminating near the east property line of 5205 W) d. Cheerful Vista Road (Hunter Drive to Sunshine Dr) 2. Lake Park Subdivision - comprising: a. Lake Park Drive (Redwood Rd to end of road near 1881 W) There is NO waterline construction within Redwood Rd right-of-way. b. Parkcrest Drive (Lake Park Dr. to Parkway Blvd, including crossing of Parkway Blvd.) c. Lake Crest Drive d. Lake Park Circle B. The work to be performed consists of furnishing and installing the facilities and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: 1. Obtaining all permits. 2. Project supervision. 3. Mobilization/Demobilization. 4. Installation of a new waterlines, residential service, fire hydrants, valves, reconstruction of various roadway improvements removed or damaged by construction and all work as shown on the Drawings
Award
Water / Sewer
$1,984,790.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2022
July 4, 2022
Multiple Locations, West Valley City, UT
Related To This Project
West Valley City, UT
--
West Valley City, UT
--
West Valley City, UT
--
West Valley City, UT
--
West Valley City, UT
Bid Date: Aug 08 2022
West Valley City, UT
Bid Date: Apr 04 2023
West Valley City, UT
Bid Date: Aug 04 2022
West Valley City, UT
Bid Date: Apr 06 2023
West Valley City, UT
Bid Date: Aug 04 2022
West Valley City, UT
Bid Date: Jun 14 2022
West Valley City, UT
Bid Date: Dec 08 2021
West Valley City, UT
Bid Date: Mar 10 2022
West Valley City, UT
--
West Valley City, UT
Bid Date: Jul 07 2022
West Valley City, UT
Bid Date: Jun 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.