BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 1, 2023 at 7:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Crystal, Minnesota. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; for outdoor lighting for a playground / park / athletic field; and sidewalk / parking lot.

The project includes the furnishing of all labor, materials, and all else necessary for construction of the Bassett Creek Park off leash dog area, parking lot, and installation of a pedestrian bridge. In general, work consists of all labor and materials for construction complete in-place, including, but is not limited to, general earthwork, concrete pavement, concrete curb, concrete abutments, prefabricated bridge installation, asphalt paving, utilities, fencing, landscaping, seeding, and site restoration. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification and other requirements of the statute is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. Direct inquiries to Landscape Architect's Project Manager Ken Grieshaber at kgrieshaber@srfconsulting.com or 763.249.6709. Questions will be received until 4:00 pm, January 24th, 2023. Bid Security in the amount of 5 percent of the amount of the bid must accompany each bid in accordance with the Instructions to Bidders. The provisions of the documents constituting the Contract shall be read together and reconciled to the greatest extent reasonably possible. To the extent there are any conflicting provisions that cannot be reconciled, the more specific provision shall generally be controlling. To the extent the conflicting provision is contained in the Special Contract Provisions (Exhibit G) or in the General Requirements and Covenants (Exhibit F), the provisions contained in such documents shall be controlling. Start construction on or after April 17, 2023 (a) Substantial completion on or before July 28, 2023. (b) Final completion on or before August 11, 2023. (c) Ready for final payment on or before August 25, 2023.

Bid Results

Sidewalks / Parking Lot

$558,007.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
141
Bidding Soon
1,592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

April 17, 2023

Project location map

Multiple Locations, Crystal, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.