Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, asbestos abatement and renovation of a municipal facility in Denver, Colorado. Completed plans call for the renovation of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.
Estimated Construction Cost: Phase I $1,000,000 Phase II $1,000,000 This project is to replace all plumbing; waste, water and vent piping and low flow restroom plumbing fixtures for the restrooms on floors 8-4 Phase I and 3-3B Phase II. The primary demolition and abatement are under separate contract. Select demolition is identified on the attached bidding documents. The restrooms will all be gutted down to studs with electrical and mechanical to be demolished under this contract. General Contractor will be required to identify on the existing walls where new door openings are to be located for the demolition/asbestos contractor. The intent of this scope is to work and complete one set of women and men's restrooms per floor at a time, working from the 8th floor down to the 3B level restrooms. Abatement and demolition will be performed over weekend with the containment structure being setup on a Friday and containment structure being disassembled on the following Monday. Plumbers will be required to connect water, sewer and vent piping to keep services active for start of Business on Monday mornings. We anticipate 1 month for each floor and an overall schedule of 12 month duration to complete all restrooms on all floors. ADA push button door operators, signage, grab bars and accessible routes to all plumbing fixtures. o New 3070 hollow metal doors and door frames o New tile walls and floors o New mirrors and accessible soap dispensers o New toilet and urinal stall partitions o New hand dryers o New lighting o New low flow porcelain toilets, urinals, sinks, faucets, flush valves and showers - LEED point requirements o New solid surface countertops Construction Start 5/31/22 Construction Complete: 5/31/23 Date Email Questions Due 5/06 2:00 PM Date Email Answers Issued 5/09 12:00 noon If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. The Contractor shall furnish a Performance Bond and a Labor and Material Payment Bond on State Forms SC-6.22, Performance Bond, and SC-6.221, Labor and Material Payment Bond, or such other forms as State Buildings Program may approve for the Project, executed by a corporate Surety authorized to do business in the State of Colorado and in the full amount of the Contract sum. All questions must be submitted in writing to Design Edge, PC Architect of Record, Mike Ragath is the prime contact m.rageth@de-arch.com 303.917.3945 The right is reserved to waive informalities and to reject any and all Bids.
Bid Results
Municipal
$882,465.00
Public - State/Provincial
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2022
May 31, 2022
1313 Sherman St, Denver, CO
Related To This Project
Denver, CO
Bid Date: Jun 01 2022
Denver, CO
Bid Date: Jun 02 2022
Denver, CO
Bid Date: Jun 09 2022
Denver, CO
Bid Date: Jun 09 2022
Denver, CO
Bid Date: Jun 09 2022
Denver, CO
Bid Date: Jun 09 2022
RFP Construction Manager - Construction Management for Sun Valley Onsite and the Tank Farm - 4682697
Denver, CO
Bid Date: Apr 21 2022
Denver, CO
--
Denver, CO
Bid Date: Feb 20 2020
Denver, CO
Bid Date: Jun 05 2020
Denver, CO
Bid Date: Oct 07 2019
Denver, CO
Bid Date: Oct 14 2021
Denver, CO
Bid Date: Jun 08 2022
Denver, CO
Bid Date: Apr 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.