BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a communication facility in Downers Grove, Illinois. Completed plans call for the construction of a communication facility; and for site work for a communication facility.

Required of All Proposers: Deposit: YES (5%) Letter of Capability of Acquiring Performance Bond: YES Required of Awarded Contractor: Performance Bond/Letter of Credit: YES Certificate of Insurance: YES Legal Advertisement Published: YES Please submit any questions in writing or via email to David Moody by 4:00 p.m. (CST) April 21st, 2022. Questions received after this time may not receive a response. Tower, Generator & Shelter to be provided by selected contractor: 1. One each 190' Sabre Monopole or like kind, based upon pre-determined design. 2. One each 10' x 20' Fiberbond shelter or like kind with standard 911 specifications. 3. One diesel 36 kW Generator & Transfer Switch for Downers Grove. To Be Provided by Others: 1. Demolition of existing salt storage roof, floor and walls as necessary. 2. Relocation of electric and gas lines from the Fleet Garage to the Storage Garages away from the tower area as needed. 3. Geotechnical soil boring to a depth of 50'. 4. Waste characterization for proper disposal of earth spoils. Scope of Work - Successful Proposer (Contractor). Engineering after bid award 1. A&E Drawings "Permitting Drawings" (Zoning/Bid drawings available) 2. NEPA / SHPO Reports 3. FCC & FAA Applications 4. 1A survey 5. Additional soil field boring and report per tower manufacturer specs if required. 6. Tower final design including foundation - contractor shall coordinate with Leopardo and FGMA for Com Ed, AT&T Fiber & Comcast Fiber to determine final routings and coordination of obtaining utilities. 7. Contractor shall communicate with MidAmerica and with all current tenants to determine needs on new tower and determine timelines for them to install onto the new tower. (AT&T, Verizon Wireless, McKay Brothers, DU-COMM & the Village of Downers Grove). 8. Adjust final tower loading based on discussions with the tenants. 9. Liaison permitting process with the Village of Downers Grove

Post-Bid

Communication

$400,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
87
Bidding Soon
1,746
All Active Projects
760
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

May 27, 2022

img_map_placeholder

To Be Determined, Downers Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.