BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Garretson, South Dakota. Completed plans call for site work for a playground / park / athletic field; and for the renovation of a playground / park / athletic field.

As of July 25, 2023, the project has been awarded. A timeline for construction has not been confirmed. Each bid in excess of $100,000.00 must be accompanied by a certified check, cashier's check or draft in the amount of 5% of the base bid and all add alternates and drawn on a State or National Bank or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to the Department of Game, Fish and Parks of the State of South Dakota. Anyone requesting, reviewing, or copying plans and specifications for this project (such individual is hereinafter referred to as "bidder") agrees that they are doing so for the sole purpose of submitting a bid on the project. The South Dakota Department of Game, Fish and Parks reserves the right to reject any or all bids and to waive any irregularities therein. Technical questions can be forwarded to Dave Lorang, davel@bannerassociates.com; Phone: 605.696.9125 SCOPE: The scope is as defined on the project drawings and in the project manual. Test, adjust, and balance the following: 1. Plumbing Pumps. 2. HVAC Pumps. 3. Air Coils. 4. Air Handling Units. 5. Fans. 3.11 MINIMUM DATA TO BE REPORTED A. Electric Motors: Phase 2 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC 1. Manufacturer. 2. Model/Frame. 3. HP/BHP. 4. RPM. 5. Service factor. 6. Sheave Make/Size/Bore. B. V-Belt Drives: 1. Identification/location. 2. Required driven RPM. 3. Driven sheave, diameter and RPM. 4. Belt, size and quantity. 5. Motor sheave diameter and RPM. 6. Center to center distance, maximum, minimum, and actual. C. Cooling Coils: 1. Identification/number. 2. Location. 3. Service. 4. Manufacturer. 5. Air flow, design and actual. 6. Water flow, design and actual. 7. Water pressure drop, design and actual. 8. Entering water temperature, design and actual. 9. Leaving water temperature, design and actual. 10. Air pressure drop, design and actual. D. Heating Coils (not required on reheat coils): 1. Identification/number. 2. Location. 3. Service. 4. Manufacturer. 5. Air flow, design and actual. 6. Air pressure drop, design and actual. E. Air Moving Equipment: 1. Location. 2. Manufacturer. 3. Model number. 4. Serial number. 5. Arrangement/Class/Discharge. 6. Air flow, specified and actual. 7. Return air flow, specified and actual. 8. Outside air flow, specified and actual. a. Adjust for both minimum and maximum quantities 9. Total static pressure (total external), specified and actual. 10. Inlet pressure. 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC 11. Discharge pressure. 12. Pressure at midpoint of supply duct system 13. Pressure at midpoint of return duct system 14. Pressure at inlet to end of system air terminal unit 15. Sheave Make/Size/Bore. 16. Number of Belts/Make/Size. 17. Fan RPM. F. Exhaust Fans: 1. Location. 2. Manufacturer. 3. Model number. 4. Serial number. 5. Air flow, specified and actual. 6. Total static pressure (total external), specified and actual. 7. Inlet pressure. 8. Discharge pressure. 9. Sheave Make/Size/Bore. 10. Number of Belts/Make/Size. 11. Fan RPM. G. Duct Leak Tests: 1. Description of ductwork under test. 2. Duct design operating pressure. 3. Duct design test static pressure. 4. Duct capacity, air flow. 5. Maximum allowable leakage duct capacity times leak factor. 6. Test apparatus: a. Blower. b. Orifice, tube size. c. Orifice size. d. Calibrated. 7. Test static pressure. 8. Test orifice differential pressure. 9. Leakage. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Playgrounds / Parks / Athletic Fields

$425,978.00

Public - State/Provincial

Renovation, Site Work

45

21

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
12
Bidding Soon
207
All Active Projects
97
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

March 11, 2024

img_map_placeholder

25491 485th Ave, Garretson, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.