Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and paving for a bridge / tunnel in Akron, Ohio. Conceptual plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Summit County Engineer's Office has begun the long process of replacing the High Level Bridge, also known as the N. Main Street Bridge over the Cuyahoga River. This bridge is by far the largest and most expensive owned by Summit County. The current plan recommended by the Summit County Engineer's office would replace the existing structure with a completely new structure as soon as practical, which is assumed to be 6-10 years. The all-new structure would be on an offset alignment to allow the existing structure to carry traffic while the new structure is built. There would be minimal disruption to traffic during construction. Additional right of way would be needed to construct the new structure. The new structure would carry four lanes of traffic and two sidewalks. The new structure is estimated to be a continuous weathering steel beam type structure composite with a reinforced concrete deck on reinforced concrete piers and abutments. founded in rock. As of March 26, 2024, this project is in the planning phase. The owner expects to select an engineer late spring 2024 with design starting around July 2024. This project is pending funding and construction is not expected to start until 2030.
Conceptual
Bridges / Tunnels
$70,000,000.00
Public - County
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2030
N Main St, Akron, OH
Related To This Project
Akron, OH
Bid Date: Mar 25 2022
Akron, OH
Bid Date: Apr 25 2022
Akron, OH
Bid Date: Apr 27 2022
Akron, OH
Bid Date: Mar 16 2022
Akron, OH
Bid Date: Apr 26 2022
Akron, OH
Bid Date: Apr 28 2022
Akron, OH
--
Akron, OH
Bid Date: Feb 23 2022
Akron, OH
Bid Date: Mar 22 2022
Akron, OH
Bid Date: Apr 12 2022
Akron, OH
Bid Date: Apr 01 2021
Akron, OH
Bid Date: Apr 01 2021
Akron, OH
Bid Date: Mar 10 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.