BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a water / sewer project in Renovo, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

Replacement of a heating boiler and potable hot water system located in the Control Building at the wastewater treatment plant. The Western Clinton County Municipal Authority is currently seeking bids for removal of a conventional boiler and installation of two natural gas fired condensing boilers along with an indirect hot water heater.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
92
Bidding Soon
980
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2022

May 31, 2022

Project location map

Erie Ave, Renovo, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.