BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2022 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Iowa City, Iowa. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

The project includes all labor, materials, and equipment necessary for the demolition of the old Hoover Elementary School and construction of the City High School tennis courts and parking lot. Work includes the demolition and removal of all Hoover Elementary infrastructure including HMA paving, PCC paving, retaining walls, trees, utilities, chain link fence, tunnels, footings and building in its entirety. Construction includes the installation of eight tennis courts with post-tension concrete, tennis court surfacing, lighting, concrete retaining walls, new chain link fence, installation of PCC parking lot and sidewalk, site grading and other related work.Iowa All work is to be done in strict compliance with the plans and specifications prepared by MMS Consultants, Inc. Equal to 5% of the bid in the form of a certified check, credit union share draft or surety bond Equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the School Board, and shall guarantee the prompt payment of all materials and labor, and also protect and save harmless the School District from all claims and damages of any kind caused directly or indirectly by the operation of the contract, and shall also guarantee the maintenance of the improvement for a period of two (2) years from and after its completion and formal acceptance by the School Board. Monthly estimates equivalent to 95% of the contract value of the work completed during the preceding calendar month. Measurements for all work bid are the responsibility of the bidder. Quantities provided herein are drawing measurements and may not reflect final on-site quantities of the project Approximate Start Date: July 13, 2022 Final Completion Date: November 15, 2022 Liquidated Damages: $200 per day The Owner reserves the right to reject any or all proposals, and also reserves the right to waive technicalities and irregularities.

Award

Playgrounds / Parks / Athletic Fields

$1,267,000.00

Public - City

Outdoor Lighting, Paving, Site Work

37

25

68

7

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
89
Bidding Soon
1,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

July 13, 2022

Project location map

2200 E Court St, Iowa City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.