BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 18, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a road / highway in South Beloit, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Paving E Stateline Road from Dry Creek east to Freechurch Road (Approx. 1.26 miles) 1. 850 tons of one (1) inch leveling course 2. 1300 tons of one and half (1.5) inch overlay 3. Base pitching (12" of base and 4" of asphalt contingency) 4. Mill (3) Butt Joints@ 3 Road Ends All work and asphalt must be done to current WISDOT specifications. Base patching must be done a minimum of two (2) days before blacktopping. Actual work shall be commenced within ten (10) days after written Notice to Proceed has been issued. All bidders must execute and file in the bid proposal a "Bidder's Proof of Competency" questionnaire, which form is included in the contract document. The questionnaire shall be kept on file and be valid for the calendar year, subject to the Contractor's status through the year. Additional blank forms of this questionnaire can be obtained from the Town Clerk office. No bid can be received or considered unless accompanied by a Bid Bond or a Certified Check equal to ten percent (10%) of the bid, payable to the Town of Turtle, as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and 100% Performance and Labor and Material Payment Bonds within ten (10) days from the date the lowest responsible bidder's bid is accepted. In the event the bidder fails to file such contract and bond within the time set by the Town, the check or bond shall be forfeited to the Town as liquidated damages. The Town of Turtle reserves the right to reject any and all bids and to waive or not to waive any informalities in the bidding. The letting of the contract described herein is subject to provisions of Sections 66.0901 and 66.0903 of the Wisconsin Statutes. The prevailing wage law does not apply to this project because it is anticipated to cost less than $234,000 for a multiple trade project for a town with a population of less than 2500 people. After bids are opened, no bid can be withdrawn for a period of one hundred twenty (120) days thereafter.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
531
Active Projects
286
Bidding Soon
3,814
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

June 3, 2022

Project location map

E State Line Rd, South Beloit, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.