BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.

*As of August 25, 2022, a general contractor has been awarded. Sealed bids are requested by the San Antonio Water System for the construction of the 2019 Small Capacity Constraints II project, SAWS Job No. 19-4525, for approximately 4,900 linear feet of 8-inch, 10-inch, 12-inch, 15-inch, and 21-inch PVC and HDPE sewer mains by open-cut, pipe-burst, and boring methods in the Vance Jackson area, Central Los Angeles Heights area, and Prospect Hill area in San Antonio. This includes the abandonment of approximately 2,600 linear feet of sewer mains in the Vance Jackson area and Central Los Angeles Heights area. The Old Brooks segment from the Multiple Sewershed Package 15 (MSP 15) is similar in work type, locale, and jurisdictional constraints consisting of 447 linear feet of 15-inch sewer mains proposed to be replaced by open-cut methods. If Bidders intend to submit bids electronically, Bidders will need to submit a request by May 19, 2022 10:00 AM (CDT) to receive access to the File Transfer Protocol (FTP) site via email to roxanne.lockhart@saws.org. Bidder's email requesting access to the FTP site shall provide the legal name of Bidder's company and the intended recipient's email address and phone number. No requests for FTP site access will be accepted after May 19, 2022 10:00 AM (CDT). For questions regarding this solicitation, technical questions or additional information, please contact Roxanne Lockhart, Contract Administrator, in writing via email to: roxanne.lockhart@saws.org or by fax to (210) 233-4438 until 4:00 PM (CDT) on May 2, 2022. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on May 6, 2022 as a separate document or included as part of an addendum. Please be advised that Bidders are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or City of San Antonio officials regarding this IFB up until the contract is awarded as outlined in the Instructions to Bidders. 19-4508 The aspirational SMWB goal is 20% of your total bid price.

Award

Water / Sewer

$4,608,924.00

Public - City

Site Work

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
115
Bidding Soon
2,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.