BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2024 at 7:00 PM

Updated January 30, 2024

Site work and paving for a mixed-use development in Westmore, Vermont. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This project consists of, but is not limited to: a. The Willoughby South End- Site + Trail project includes the construction of new upper and lower gravel parking lots and site access, a new accessible boat launch drop-off and water access, associated grading and stormwater features, site features including wood barriers and bollards, bike racks, stone steps, stone walls, and concrete signage pads, boulder placement, landscape seeding and landscape planting. b. The Site and Trail projects need to be closely coordinated by the contractor of each project to ensure efficient and timely construction sequencing. Bids accompanied by proper Bid Security will be received

Post-Bid

Sidewalks / Parking Lot

$700,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
110
Bidding Soon
1,945
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2024

February 26, 2024

Project location map

5646 VT-5A, Westmore, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.