New construction of an educational facility in Cleveland, Georgia. Completed plans call for the construction of a 41,100-square-foot, one-story above grade educational facility.

New home for performing arts in White County School board members broke ground Tuesday on a new 41,000 square-ft. performing arts center on the campus of White County High School. From left are Linda Erbele, vice-chairman Charlie Thomas, Superintendent Dr. Laurie Burkett, chairman Missy Jarrard and Jon Estes. Body Officials broke ground Tuesday on a new performing arts center for the White County School District that will double the seating capacity of the current facility. When completed sometime next year, the 41,000 square-foot single-story building, located at the former site of the baseball field on the campus of White County High School, will contain a 700-seat performing arts theater, along with choral, band and drama suites with supporting and administrative spaces. The construction costs, estimated in excess of $10 million, are being paid from the proceeds of a Education Special Local Option Sales Tax that was approved by voters. "This is super exciting," said Superintendent Laurie Burkett at Tuesday's groundbreaking. "None of this happens without our community supporting our ESPLOST referendum." "White County has nothing like this," school board vice-chairman Charlie Thomas said in a story published in the White County News earlier this year. "We've never had a facility like this. It's going to seat around 700 to 750. There's no place in this county to have that kind of gathering together. My vision of this facility, it's not just for the school, it's for the entire community. I can see concerts happening here, movie nights, meetings. I just think there's a lot of things that will greatly enhance this community." Burkett praised the resolve of school board members, who continued to support the project in times of economic uncertainty. "This was a time when things were a little scary, when your numbers creep up for different reasons," Burkett said. "At any point, we could have said nope, but we didn't." Burkett also thanked the planning committee members who contributed their time and expertise to planning for the new facility. "I'm grateful to live in a place where lots of people care a whole lot," she said. The new performing arts building is just one of several construction and improvement projects underway throughout the school district. In the past year, the school board purchased nearly 15 acres of land adjacent to the high school that will be used for baseball and softball fields and other enhancements. Charles Black Construction is the builder for the performing arts center project. Architecture work is being done by Breaux and Associates. ____________________________ Bid Results will only be available to those companies that submit a bid. The project includes a new single story building containing a 700 seat performing arts theater. Also included will be a choral, band, and drama suites with supporting spaces and administrative spaces. Additionally, a new athletics complex. The construction phase involves completing the Performing Arts Center (PAC) and Athletic Complex - White County High School per the Construction Manager's schedule. Substantial Completion for the Performing Arts Center is May 31, 2023. Substantial Completion for the Baseball Field is January 1, 2023. The Practice Field and Softball Field must be completed by April 2023. Bid Package Number Name 1 Sitework 2 Curb & Gutter, Asphalt Paving 3 Fencing 4 Concrete 5 Masonry 6 Structural, Miscellaneous Steel 7 TPO Roofing 8 Standing Seam Metal Roofs 9 Hollow Metal Doors, Frames & Hardware 10 Installation of Doors & Hardware 11 Overhead Coiling Doors 12 Aluminum Framed Storefront / Glass & Glazing 13 Drywall / Ceilings / EIFS / Acoustical Panels 14 Resilient Tile Flooring, Carpet, Base & Accessories 15 Ceramic Tiling 16 Decorative Resinous Epoxy Flooring 17 Interior & Exterior Painting 18 Specialties 19 Aluminum Canopies 20 Theatre & Stage Equipment 21 Fixed Auditorium Seating 22 Manufactured Casework 23 Plumbing 24 Fire Protection 25 HVAC 26 Electrical 27 Applied & Intumescent Fireproofing Emergency lighting fixtures, presently shown to operate 24/7, shall be routed through UL approved emergency lighting transfer contactors.

Under Construction

Educational

$10,000,000.00

Public - City

New Construction

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
89
Bidding Soon
1,426
All Active Projects
606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

July 11, 2022

img_map_placeholder

2600 US-129, Cleveland, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.