BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Clinton, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project is to provide concrete crack filling, removal and replacement of concrete, catch basin installation, concrete island installation, sealing asphalt and line striping of various parking lots and drives. Additional information can be obtained by contacting: Keith Vogel, Clinton Community College, Clinton, Iowa 52732, 563-244-7035, e-mail: kevogel@eicc.edu. The District reserves the right to accept or reject any or all proposals. . Fill existing identified cracks 1/4 - inches or larger (approx. 7,500 lineal feet) and seal with hot rubberized asphalt crack sealant in existing concrete area where otherwise surrounding concrete in good condition. 2. Seal coat pavement (approximately 81,350 square feet) including cleaning all dirt and debris. Sealant should be mixed with silica sand and be coated twice. First coat at a rate of at least 0.15 galloon per square yard. The second coat at a rate of at least .10 gallon per square yard. 3. Area by Northeast entrance will be removed (approximately 38 square yards) will be removed and replaced with up to 12 inches of stabilizing rock. Patching of up to 6 inches will be needed to meet the existing level of the parking lot. 4. Optional catch basin needed for proper water drainage to avoid ponding on west side on parking lot near parking garage. 5. Re-stripe the current layout which includes the motorcycle course striping. 6. Contractor shall provide all labor, material, parts, tools, devices and equipment necessary to complete the project. 7. Contractor is responsible for obtaining any local or regional permits required. 8. Work shall be completed in accordance with accepted practices. 9. Contractor shall deliver to Clinton Community College Facilities Manager all safety data sheets for all materials, sealants, chemicals and coatings used at the property. 10. Materials shall be applied in accordance with manufacturer’s directions. 11. The contractor shall notify the Clinton Community College Facilities Manager 48 hours before arriving onsite to preform services. 12. Contractor shall work with the Clinton Community College Facilities Manager to schedule areas to be blocked off. 13. The contractor shall clean up after EACH DAY’s WORK, including proper off-site disposal of job-related materials and trash. 14. Contractor shall provide W-9 (if needed) and certificate of liability insurance in accordance with the requirements and limits mandated by the Eastern Iowa Community Colleges. 15. Contractor shall submit an invoice upon completion of the project (100% completion), such statement to include a detailed breakdown of all quantities, unit costs, charges, and total costs.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
47
Bidding Soon
1,147
All Active Projects
424
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 6, 2022

June 6, 2022

August 1, 2022

img_map_placeholder

1000 Lincoln Blvd, Clinton, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.