Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in San Francisco, California. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and transportation facility.
As of October 17th, 2022, project has not been awarded yet. No timeline of award was established. part of a larger San Francisco Municipal Transportation Agency (SFMTA) system-wide effort to improve accessibility of the MUNI subway system, the Castro Station will undergo several upgrades in and around the station area to improve ADA access to the station and transit services. The Castro Station Elevator Project will add a second elevator to the station to provide continuous access to the station and trains. The 4-stop elevator design includes a translucent etched pattern on clear laminated glass facade to provide unobstructed sightline into the elevator cab to improve rider safety. To create a safer and ADA compliant paths of travel, the brick paving area around the station entrance at street and Concourse levels will be regraded. A portion of the sidewalk on Market Street will be made wider, and new curb ramps will be added at Market and Collingwood Streets. The existing plaza lighting will be replaced, the terraces at the Concourse level will be re- planted, and new fences and bench will be installed. Good Faith Efforts. In accordance with Administrative Code Chapter 14B requirements, all bidders shall submit documented good faith efforts with their bids, except those who exceed the above stated LBE subcontracting participation requirement by 35%. Bidders must achieve 80 out of 100 points to be deemed responsive. Bidders will receive 15 points for attending the pre-bid conference. Refer to CM D Form 2B. For details, contact Ivan Oldenkamp by phone at (415) 515- 6793 or by email at ivan.oldenkamp@sfgov.org For information on the City's Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com Class "B" license required to bid.
Post-Bid
Transportation Terminals
$12,000,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 24, 2022
September 12, 2022
Multiple Locations, San Francisco, CA
Related To This Project
San Francisco, CA
--
San Francisco, CA
Bid Date: Nov 18 2022
San Francisco, CA
Bid Date: Oct 14 2022
San Francisco, CA
Bid Date: Oct 28 2022
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Oct 11 2022
San Francisco, CA
--
San Francisco, CA
Bid Date: Oct 20 2022
San Francisco, CA
Bid Date: Nov 29 2022
San Francisco, CA
Bid Date: Nov 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.