Published May 18, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Quincy, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work under this Contract includes, but is not limited to, sewer pipe and manhole rehabilitation Work including installation of cured-in-place gravity sewer pipe in various sizes throughout the City of Quincy; manhole frame and cover replacement backfilling and paving; and all materials and equipment, services and construction inherent to the Work. The Work shall be substantially complete within 180 calendar days from the commencement of Contract Time (with certain locations prioritized per the Summary of Work), Post Substantial Completion Punchlist complete (all Work except Warranty Inspection and final paving) within 210 calendar days from the commencement of Contract Time and Warranty Inspection and final paving complete (ready for final payment) within 14 calendar days prior to expiration of the Warranty Period (351 days from Substantial Completion). Each Bid shall be accompanied by a Bid security in the amount of five percent (5%) of the total value of the Bid in the form of a Bid bond or certified/treasurer's check. The bidding and award of this Contract shall be in full compliance with Massachusetts General Laws, Chapter 30, Section 39M, as last revised, all Federal, State and City of Quincy regulations when applicable in relation to Minority Business Enterprise, Women's Business Enterprise, Minority Work Force, Equal Employment Opportunity, and subject to the minimum wage rates set under the Massachusetts Prevailing Wage Law Chapter 149, 26 to 27H and/or any applicable federal rates. The City reserves the right to waive any informality in or to reject any or all Bids when such an action is deemed in the best interests of the City. This Project is to be funded in part with monies made available by the Clean Water State Revolving Fund (SRF) and is to be funded in part by the Massachusetts Clean Water Trust (the "Trust"), and compliance with the following is required: Environmental Protection Agency's (EPA) Diesel Retrofit Program; EPA/Massachusetts Department of Environmental Protection (MassDEP) Division of Municipal Services (DMS) Disadvantaged Business Enterprise Program; the American Iron and Steel requirements of P.L. 113-76 (the Consolidated Appropriations Act of 2014); Davis-Bacon Act and wage requirements; and other MassDEP/DMS provisions and policies. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid under the resulting construction Contract. The goals for this Project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs. The two lowest responsive Bidders shall submit completed DBE forms (EEO-DEP-190C & EEODEP-191C and DBE Certification of United States Citizenship form) by close of business on the third business day after Bid opening. Failure to comply with these requirements may render a Bid non-responsive. No waiver of any provision of the D/MBE & D/WBE Requirements will be granted unless approved by the MassDEP.

Bid Results

Water / Sewer

$1,482,736.00

Public - City

Paving, Site Work

76

228

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Wall and Door Protection, Exterior Specialties, Protective Covers, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Relining Sewers, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
159
Bidding Soon
2,649
All Active Projects
1,087
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 6, 2022

img_map_placeholder

Multiple Locations, Quincy, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.