BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Anaheim, California. Completed plans call for the renovation of a water / sewer project.

Furnishing all labor, materials and equipment for: The Fullerton Main Plant PFAS Water Treatment Plant project generally consists of the following major components. 1. Take delivery and install District furnished Dual Media Pressure Vessel systems at the Water Treatment Plant including pressure testing, disinfection, and bacteria testing. 2. Take delivery and install District furnished Granular Activated Carbon (GAC) system media into dual media pressure vessels. 3. Furnish and install a backwash system for the Granular Activated Carbon (GAC) system. Coordinate and assist with installation of District purchased media. 4. Rehabilitation (redevelopment) of City water supply well number 3A. 5. Furnish and install a new well pump and motor. 6. Water Treatment Plant Structural Concrete: Construct structural concrete at the Fullerton Main Plant site for the PFAS Water Treatment Plant. 7. Connect to the Water Treatment Plant and to the distribution system: Furnish and install epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipelines to the Granular Activated Carbon (GAC) system. Construct epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipeline from the GAC system to the connection to the distribution system. 8. Paving and Site Improvements: Grading, Asphalt Paving, and drainage at the new water treatment plant. 9. Exterior Wall, gate, landscaping, and irrigation. 10. Electrical and Instrumentation: Electrical equipment and facilities, and instrumentation equipment and facilities at the new water treatment plant. Instrumentation and control systems shall be coordinated with the City's Controls Integrator. 11. Provide all commissioning and start-up-services. Bid Guarantee: Each Bid Shall Be Accompanied by One of the Following: a Certified or Cashier's Check, or Bid Bond in an Amount Not Less Than Ten Percent (10%) of the Total Bid Price, Payable to the Orange County Water District, as a Guarantee That the Bidder, if Its Bid Is Accepted, Shall Promptly Execute the Agreement, Furnish a Satisfactory Faithful Performance Bond in an Amount Not Less Than One Hundred Percent (100%) of the Total Bid Price, Furnish a Labor and Material Bond in an Amount Not Less Than One Hundred Percent (100%) of the Total Bid Price, and Furnish Certificates Evidencing That the Required Insurance Is in Effect in the Amounts Set Forth in the Insurance Conditions. All Questions Relative to This Project Prior to the Opening of Bids Shall Be Directed, in Writing, to the Engineer for the Project: Orange County Water District 18700 Ward Street Fountain Valley, Ca 92708 Mailing Address: P.o. Box 8300 Fountain Valley, Ca 92728-8300 Attention: Ryan Bouley, P.e. Telephone: 714/378-8207 Facsimile: 714/378-3373 Substitution of Securities: at the Request and Expense of the Successful Bidder, the District Will Pay the Amounts Retained Pursuant to the Contract Documents as Security for the Completion of the Work in Compliance With the Requirements of Public Contract Code Section 22300 and the Provisions of the General Provisions Pertaining to "Substitution of Securities. Contractor's License Specification: in Accordance With the Provisions of California Public Contract Code Section 3300, the District Requires That the Bidder Possess the Following Classification of Contractor's License at the Time That the Bid Proposal Is Submitted: Class a. If the License Classification Specified Hereinabove Is That of a "Specialty Contractor" as Defined in Section 7058 of the California Business and Professions Code, the Specialty Contractor Awarded the Contract for This Work Shall Itself Construct a Majority of the Work, in Accordance With the Provisions of California Business and Professions Code Section 7059. Each Bidder Shall Clearly Write or Type Their Contractor's License Number on the Outside of the Bidding Envelope. Contractor's Registration: in Accordance With Labor Code Section 1771.1.a, Contractor or Subcontractor Shall Not Be Qualified to Bid on or Be Listed in a Bid Proposal or Engage in the Performance of This Work Unless Currently Registered and Qualified to Perform the Work Pursuant to Labor Code Section 1725.5. Compliance Monitoring and Enforcement: Contractor's Performance of the Work Described in This Notice Inviting Bids Is Subject to Compliance Monitoring and Enforcement by the California Department of Industrial Relations. Sheeting, Shoring and Bracing: Pursuant to the Provisions of California Labor Code Section 6707, Each Bid Submitted in Response to This Notice Inviting Bids Shall Contain, as a Bid Item, Adequate Sheeting, Shoring, and Bracing, or Equivalent Method, for the Protection of Life and Limb in Trenches and Open Excavation, Which Shall Conform to Applicable Safety Orders. Contractor Safety Program: the District Has Instituted a Contractor Safety Program to Comply With Cal/osha's Multi-employer Worksite Standards. A Copy of the District's Contractor Health & Safety Handbook Is Appended as Exhibit B of These Contract Documents. Potential Bidders Are Strongly Encouraged to Familiarize Themselves With This Handbook and Complete and Submit Appropriate Forms With Their Bid Proposal as Indicated. Completion of Work and Liquidated Damages: All Work Must Be Substantially Completed Within Three Hundred Thirty (330) Consecutive Calendar Days From the Date of the Notice to Proceed Issued by the District. Failure to Complete the Work Within the Time Set Forth Herein Will Result in the Imposition of Liquidated Damages for Each Day of Delay, in the Amount Set Forth in the Information for Bidders. District's Rights Reserved: the Orange County Water District Reserves the Right to Reject Any or All Bids, and to Waive Any Informality in Any Bid.

Award

Water / Sewer

$8,053,035.00

Public - County

Renovation

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
516
Active Projects
245
Bidding Soon
3,869
All Active Projects
1,695
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 29, 2022

October 15, 2022

October 31, 2023

img_map_placeholder

627 La Palma Ave, Anaheim, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.