BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Ephrata, Pennsylvania. Completed plans call for site work for a road / highway; and water / sewer project.

clarification are due Monday, May 2, 2022 12:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)] The work includes selective site demolition, surveying, bank stabilization grading, fencing, livestock crossings, erosion and sedimentation controls, bypass pumping and landscape plantings along an Unnamed Tributary (UNT) to the Conestoga River off of Turtle Hill Road in West Earl Township, Lancaster County, PA. Bid bond or certified check for 10% of the total base bid payable to "West Earl Township" (Owner) shall accompany each proposal, to be forfeited in liquidated damages should the bidder default in execution of the contract within 180 days after award of same. Bids may not be withdrawn within 60 days after bid opening. The Owner shall award the contract to the lowest responsible and responsive bidder or reject all bids within sixty (60) days from the date of the bid opening; provided, however, if the award is delayed by the required approval of another governmental agency, the sale of bonds, easement acquisition or the award of a grant, the Owner shall reject all bids or award the contract to the lowest responsible and responsive bidder within one-hundred twenty (120) days from the date of the bid opening. Notice is hereby given to bidders that this project is subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987) as amended. The West Earl Township hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid. PROJECT DESCRIPTION A. The Work of the Project is defined by the Contract Documents and consists of the following: 1. The work covered by these specifications is located along the unnamed tributary to the Conestoga River at Turtle Hill Road. The work includes selective site demolition, surveying, bank stabilization grading, fencing, livestock crossings, erosion and sedimentation controls, bypass pumping and landscape plantings. 2. Work is shown on the Contract Drawings titled "CONESTOGA RIVER UNT BANK STABILIZATION AT TURTLE HILL ROAD" prepared by LandStudies, Inc. Dated April 5, 2022 sheets 1 through 14, inclusive.

Bid Results

Water / Sewer

$244,525.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
96
Bidding Soon
2,049
All Active Projects
936
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2022

June 15, 2022

img_map_placeholder

Turtle Hill Rd, Ephrata, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.