BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in San Gabriel, California. Design plans call for site work for a playground / park / athletic field; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Per the owner, as of August 29, 2024, an engineering team has been selected. The owner states that the project is in design. Owner states that the project is anticipated to bid in April of 2025 and construction is anticipated to begin in June 2025. ............. In April 2023, the City of San Gabriel (City) was awarded a grant through the Los Angeles County Regional Park and Open Space District (RPOSD) to formalize the unofficial access path from Vincent Lugo Park to the east side of an existing bridge over Alhambra Wash near Newby Avenue and Abbot Avenue and replace the existing worn-out pedestrian bridge. Once the area is improved, awareness and visitation to Vincent Lugo Park will increase because of new wayfinding signs and path improvements. The bridge restoration and path improvements will also enhance public safety. A preliminary scope of services is provided below. Specific details of the scope of work, deliverable schedules, and fees for each project task/phase will be negotiated after the engineering consultant selection. Engineering work is expected to begin upon consultant selection. The contract may be amended at a later date to include additional related services if deemed necessary by the City. The City anticipates that all engineering work must be completed by March 26, 2024. The Request for Proposals is not an offer or a contract. The City reserves the right to 1) Accept or reject any or all proposals; 2) Waive any requirement of this RFP 3) Negotiate with any or all responders and 4) Modify or cancel this RFP. The City will not compensate or reimburse the responders for costs incurred in the preparation of any proposals under any circumstances. The new proposed trail includes constructing a 0.15 mile ADA-compliant trail to the established 0.5-mile loop trail in order to safely access the pedestrian bridge from the south end of Vincent Lugo Park. Replacement of the existing pedestrian bridge includes demolition of the existing bridge (the two existing steel I-beams shall remain) and construction of a new pedestrian bridge utilizing the two existing I-beams across Alhambra wash to connect between West Newby Avenue and Hovey Avenue. Improvement of the existing paved path shall include resurfacing the asphalt pavement with cool surface coating from the east end of the pedestrian bridge to the west end of Hovey Avenue.

Design

Playgrounds / Parks / Athletic Fields

$401,170.00

Public - City

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
229
Bidding Soon
3,639
All Active Projects
1,669
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 2, 2025

img_map_placeholder

Multiple Locations, San Gabriel, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.