BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Riverton, Utah. Completed plans call for the renovation of a water / sewer project.

The work shall be completed within 120 calendar days from the date of acceptance of the Award of Purchase Order. If the work is not completed within the specified time frame, the bidder herein agrees to accept liquidated damages in the amount of $50 per day. An Award of Contract, if it were awarded, will be made within 60 calendar days of the opening of bids. Provide and install acoustical improvements within existing rooms at the Jordan Valley Water Treatment Plant 15305 South 3200 West, Herriman Utah. The improvements are desired to mitigate noise emitted by the blowers to the water quality laboratory located above the blower room. Improvements include: o Blower Room- Acoustical foam treatments for the lower walls and upper walls, replacement of the existing door with an acoustically rated double door assembly, installation of a new suspended ceiling, and other improvements as shown on the plans. o North adjacent room- Acoustic pipe insulation as shown on the plans. o Silencer Room- Acoustic pipe insulation around the existing silencer, installation of a new suspended ceiling, and other improvements as shown on the plans. Supply Closet-replace existing door with an acoustically rated assembly, and other improvements as shown on the plans.

Award

Water / Sewer

$98,400.00

Public - County

Renovation

10

8

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
28
Bidding Soon
532
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2022

December 1, 2022

img_map_placeholder

15305 S 3200 W, Riverton, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.