Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Sturbridge, Massachusetts. Contact the soliciting agency for additional information.
THE WORK CONSISTS OF: Furnish all labor, equipment, materials, and transportation necessary to accomplish the following tasks at East Brimfield Reservoir and Long Pond: Conduct a comprehensive pre-treatment lake survey and report to identify the distribution and abundance of native and target aquatic invasive vegetation species (fanwort, Eurasian watermilfoil, and variable watermilfoil). Apply a systematic aquatic herbicide to approximately 40 acres to control fanwort, Eurasian watermilfoil, and variable watermilfoil. Conduct a post-treatment lake survey with a final report that identifies the distribution and abundance of target vegetation species, and evaluates the efficacy of the aquatic herbicide treatment, as well as provide future management recommendations for aquatic invasive species This procurement is set-aside for small business vendors. The applicable NAICS code is 541990 with a Small Business Size Standard of $16.5 Million. ALL OFFERORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY OFFEROR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. INSTRUCTIONS TO OFFERORS PLEASE DIRECT QUESTIONS TO FRED E. RILEY AT (978) 318-8256 OR FRED.E.RILEY@USACE.ARMY.MIL. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL CASES. ** QUOTES CAN BE E-MAILED TO FRED RILEY AT FRED.E.RILEY@USACE.ARMY.MIL. THE BID SCHEDULE MUST BE COMPLETED AND SUBMITTED FOR A QUOTE TO BE CONSIDERED COMPLETE. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers. NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor's responsibility to track SAM.gov registration and follow-up with required tasks. General 1. Scope - Furnish all labor, equipment, materials, and transportation necessary to accomplish the following tasks at East Brimfield Reservoir and Long Pond: a. Conduct a comprehensive pre-treatment lake survey and report to identify the distribution and abundance of native and target aquatic invasive vegetation species (fanwort, Eurasian watermilfoil, and variable watermilfoil) b. Apply a systematic aquatic herbicide to approximately 40 acres to control fanwort, Eurasian watermilfoil, and variable watermilfoil c. Conduct a post-treatment lake survey with a final report that identifies the distribution and abundance of target vegetation species, and evaluates the efficacy of the aquatic herbicide treatment, as well as provide future management recommendations for aquatic invasive species0 Location - East Brimfield Dam is a flood risk management project located on the Quinebaug River in Fiskdale, Massachusetts. The project office is located at 24 Riverview Avenue, Fiskdale, Massachusetts. 3. Site Visit - Contact the Technical Point of Contact, (TPOC) Project Manager, Keith Beecher (978) 318-8405 keith.w.beecher@usace.army.mil to arrange a site visit. 4. Schedule - All work will be completed from contract award through November 30, 2022. The project area will be open to the contractor Monday through Friday 8:00 AM to 4:30 PM and all work must be done during those hours unless additional hours are approved by the TPOC. No work shall be done on weekends or Government holidays. The schedule for herbicide application will be determined by and must be strictly adhered to the requirements set forth by the Commonwealth of Massachusetts. 5. Safety - a) All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable OSHA, federal, state, and local safety, and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:
Post-Bid
Water / Sewer
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2022
June 7, 2022
24 Riverview Ave, Sturbridge, MA
Related To This Project
Sturbridge, MA
Bid Date: May 26 2022
Sturbridge, MA
Bid Date: Apr 07 2022
Sturbridge, MA
Bid Date: Mar 09 2022
Sturbridge, MA
Bid Date: May 09 2022
Sturbridge, MA
Bid Date: Aug 03 2022
Sturbridge, MA
Bid Date: May 09 2023
Sturbridge, MA
Bid Date: May 05 2022
Sturbridge, MA
Bid Date: Apr 26 2022
Sturbridge, MA
Bid Date: Feb 10 2022
Sturbridge, MA
Bid Date: Nov 04 2022
Sturbridge, MA
Bid Date: Jul 18 2022
Weston, MA
Bid Date: Apr 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.