Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 16, 2022 at 7:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Blountsville, Alabama. Completed plans call for site work for a water / sewer project.
The Project is generally described as follows: Labor Only installation of approximately 5,500 LF of 6" C900 DR 18 PVC water main, 700 LF of 8" HDPE DR 9, five (5) EA 6" gate valves, remove and reset five (5) existing fire hydrants and related appurtenances. Work shall also include reconnecting water services to new water main. Materials are on site. Bidders will be required to provide Bid security in the form of a Bid Bond or cashier's check in the amount of a sum no less than five (5) percent of the Bid Price. All bids must be submitted in a sealed envelope bearing on the outside the name of the bidder, bidder's license number, address, and name of the project. Your Bid will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. The attention of bidders is called to the provisions of State Law Governing General Contractors, as set forth in Title 34, Chapter 8, Article 1, Code of Alabama of 1975, as amended; and the provisions of said law shall govern bidders insofar as it is applicable. The above-mentioned provisions of the Code make it illegal for the Owner to consider a bid from anyone who is not properly licensed under such code provisions. In addition, bidders must carry the municipal and utility construction classification as listed in the latest edition of the Roster of the State Licensing Board for General Contractors, Montgomery, Alabama. The Owner, therefore, will not consider any bid unless the bidder produces evidence that he is so licensed. Neither will the Owner enter into a Contract with a foreign corporation which is not qualified under State Law to do business in the State of Alabama. The attention of nonresident bidders is called to the provisions of Alabama Law, Title 39, Chapter 3, Code of Alabama 1975, as amended, relating to preference to be given to resident contractors in Alabama over nonresident contractors in the award of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident contractor, and to the requirements that the bid documents tendered by any nonresident contractor must be accompanied by a written opinion of an attorney-at-law licensed to practice law in such nonresident contractor's state of domicile as to the preference, in any or none, granted by the law of that state to its own business entities who's principal places of business are in that state in the letting of any or all public contracts. The Owner reserves the right to accept or reject any or all Bids.
Award
Water / Sewer
$253,799.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2022
November 3, 2022
US-231, Blountsville, AL
Related To This Project
Blountsville, AL
Bid Date: May 18 2023
Blountsville, AL
Bid Date: Feb 09 2022
Blountsville, AL
Bid Date: Jul 14 2022
Blountsville, AL
Bid Date: May 21 2024
Blountsville, AL
Bid Date: Sep 17 2024
Blountsville, AL
--
Blountsville, AL
Bid Date: Mar 18 2025
Blountsville, AL
Bid Date: Jun 27 2025
Enterprise, AL
Bid Date: Nov 09 2022
Montgomery, AL
Bid Date: Sep 08 2022
Muscle Shoals, AL
Bid Date: Jan 30 2024
Rogersville, AL
Bid Date: Aug 27 2024
Mobile, AL
Bid Date: Nov 02 2022
Evergreen, AL
Bid Date: Nov 01 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
