BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work and new construction of a fire / police facility in Blountsville, Alabama. Completed plans call for the construction of a 9,000-square-foot, one-story above grade fire / police facility; and for site work for a fire / police facility.

New Summit Fire Station Bids That Are Received via Mail and Not Presented at the Bid Opening Are to Be Considered Non-responsive. It is the Responsibility of the Bidder to Assure That Bids Are Presented at the Time of the Bid if They Choose to Mail the Bid. Contractors Must Notify the Awarding Authority if a Bid is to Be Received by Mail. A Cashier's Check or Bid Bond Payable to Summit Volunteer Fire Department in an Amount Not Less Than Five (5) Percent of the Amount of the Proposal, but in No Event More Than $10,000.00, Must Accompany the Bidder's Proposal for Each Project. Performance and Payment Bonds and Evidence of Insurance as Required in the Bid Documents Will Be Required at the Signing of the Contract. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provisions of Title 34, Chapter 8, Code of Alabama, 1975. The Bidder Must Display Current General Contractor's License Number on the Outside of the Sealed Envelope in Which the Proposal is Delivered, or It Will Not Be Considered by the Architect or Owner. The Owner Reserves the Right to Reject Any or All Proposals and to Waive Technical Errors if, in the Owner's Judgment, the Best Interests of the Owner Will Thereby Be Promoted. All RFCs must be numbered and made in writing to the Architects email rfi@lathanassociates.com. Please include your name, company name and telephone number, so that we may respond appropriately. VERBAL RFL'S WILL NOT BE ANSWERED, ALL RFL’S MUST BE IN WRITING. Site work, new single-level, gypsum board wall construction with metal siding, aluminum windows and metal roof, on pre-engineered structural metal frame, paint finish, acoustical tile ceiling, floor finishes, kitchen equipment, plus plumbing, mechanical and electrical work as required to perform the work under this Contract for the Summit Fire Station and to properly join, connect and finish the new work to bring all to final, finished completion in first class manner ready for use by the Owner, all in strict accordance with Contract Documents including plans and specifications as prepared by Lathan Associates Architects, P. C, Hoover, Alabama; and shall include the furnishing of alt labor, materials, equipment and services necessary for the proper completion of the building and other work as called for in the drawings and / or specifications date February 21, 2025

Post-Bid

Fire / Police

$400,000.00

Public - City

New Construction, Site Work

37

23

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
60
Bidding Soon
757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 18, 2025

Project location map

79094 US-231, Blountsville, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.