BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Long Beach, California. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of 6/22/2022 project was cancelled and planning for a rebid. No rebid date yet. PTN- 64725-429 Project No-102.64 Project Type Bid Response Types Line Items General Attachment Type of Award Lump Sum License Requirements A or C-12. All work performed for this project must be done by properly licensed and/or certified contractors/subcontractors. Bid Valid 90 days Liquidated Damages $2,000/day Estimated Bid Value $1,200,000 Start/Delivery Date Approx 6/21/2022 Project Duration 60 consecutive calendar days To bid on this Project, Bidders with an A or C-12 license are required to have been prequalified by the District. In addition, if the Project has electrical, mechanical, or plumbing components that will be performed by subcontractors performing under the following license classification(s), then each of those subcontractors that intend to bid as a first-tier subcontractor to a general contractor (prime contractor) are required to have been prequalified by the District: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46. Removal and replacement of asphalt; including new compacted base, new curb and gutters, surface seal, new parking bumpers and striping. Central Services Ph 2: Removal and replacement of asphalt; including new compacted base, new curb and gutters, surface seal, new parking bumpers and striping. Riley ES Ph 1: Removal and replacement of asphalt; including new compactible base, new parking bumpers and striping, surface seal and new playground striping. Burbank ES & Whittier ES: Removal and replacement of asphalt; including new playground striping, site parking lot striping, new parking lotsignage, wheel stops, and demolition of existing playground matting. For Burbank: The parking lot located off of Dawson Avenue (corner north east of the site) will not be included in the project scope. Cleveland ES Ph 1: Removal and replacement of asphalt; including new playground striping, site parking lot striping, new parking lot signage and wheel stops, and demolition of existing playground matting. Lindsey MS: Removal and replacement of asphalt; including new playground striping, site parking lot striping, new parking lot signage, and wheelstops. The parking lot located near the gym/field (northwest of the site) will not be included in the projectscope

Final Planning

Sidewalks / Parking Lot

$752,000.00

Public - City

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
102
Bidding Soon
2,359
All Active Projects
1,032
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2022

December 22, 2022

img_map_placeholder

1761 Walnut Ave, Long Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.