Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Demolition and site work for an educational facility in Cobden, Illinois. Completed plans call for the demolition of a 12,000-square-foot educational facility; and for site work for a educational facility.

The Work of the Project is defined by the Contract Documents and consists of the following: 1. Removal and legal disposal of approximately 12,000 sq ft existing building system in its entirety. 2. Salvage, removal, and legal disposal of building and/or site items as noted. 3. Removal, protection, coordination, and/or relocation of site utilities as noted. 4. Securing and providing weathertightness to the adjacent existing building.

Post-Bid

Educational

$80,000.00

Public - City

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
59
Bidding Soon
1,024
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2022

June 1, 2022

Project location map

413 N Appleknocker Dr, Cobden, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed