BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sunsites, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Tracs No: 191 CH 087 F045701C Project No: 191-B-NFA Termini: BOWIE JCT - SAFFORD HIGHWAY (US191) Location: I-10 TI TO TEN RANCH ROAD Route No. Milepost District Item No. US 191 87.50 to 94.47 SOUTHEAST 102772 The amount programmed for this contract is $3,800,000. The proposed project is located in Cochise and Graham Counties on US191 between mileposts 87.50 and 94.47 near Bowie. The proposed work consists of applying two-pass micro-surfacing on an existing asphaltic concrete pavement surface. The project also includes spot repair work by milling and replacing with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work. The time allowed for the completion of the work included in this contract will be 70 working days. The Arizona Department of Transportation, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252.42 U.s.c. 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. The Minimum Contract-specified Goal for Participation by Disadvantaged Business Enterprises in the Work, as a Percentage of the Total Amount Bid, Shall Be 5.78. To Submit a Valid Bid, the Bidder Must (1) Have Prequalification From the Department as Necessary for the Project, and (2) Be Included on the Project Planholders List as a Prime. The Application for Contractor Prequalification May Be Obtained From the Contracts and Specifications Website. This Contract Is Subject to the Provisions of Arizona Revised Statutes Section 42-5075 -- Prime Contracting Classification; Exemptions; Definitions. No Award Will Be Made to Any Contractor Who Is Not a Duly Licensed Contractor in Accordance With Arizona Revised Statutes 32-1101 Through 32-1170.03. All Labor Employed on This Project Shall Be Paid in Accordance With the Minimum Wage Rates Shown in the General Wage Decision. These Rates Have Been Determined in Accordance With the Requirements of the Law and Issued by the Secretary of Labor for This Project. The Wage Scale Is on File in Contracts and Specifications Section and Copies May Be Obtained at All Reasonable Times. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only From Corporate Sureties Authorized to Do Business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.e. Group Manager Contracts & Specification AZDOT - Bowie Jct - Safford Highway (Us191) (I-10 Ti - Ten Ranch Rd)

Award

Roads / Highways

$3,336,797.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
2
Bidding Soon
114
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2022

July 12, 2022

img_map_placeholder

US-191, Sunsites, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.