BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in North Charleston, South Carolina. Completed plans call for site work for a water / sewer project.

The North Charleston Sewer District is accepting Bids from qualified licensed firms to install additional fiber cables within our facilities at our Felix C. Davis Wastewater Treatment Plant. The selected firm will be responsible for installing a 12-strand fiber cable in the locations shown on the location map. The cable will need to be terminated at twelve (12) new boxes through the plant as shown on the map. North Charleston Sewer District reserves the right to reject any and all bids. The North Charleston Sewer District is seeking to install additional fiber cables within our facilities at our Felix C. Davis Wastewater Treatment Plant. The contractor will be responsible for installing a 12-strand fiber cable in the locations shown on the location map. The cable will need to be terminated at twelve (12) new boxes through the plant as shown on the map. These locations are also shown in the appendices via photos The specifications for the fiber cable are as follows: 62.5-micron core/125-micron cladding Maximum allowable signal loss = 1 dB/km at a wavelength of 1300 nm Maximum allowable signal loss = 3.5 dB/km at a wavelength of 850 nm. Cable shall be plenum jacketed All cable termination shall be “LC” terminations

Award

Water / Sewer

$85,589.00

Public - City

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
71
Bidding Soon
788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2022

June 27, 2022

Project location map

1000 Herbert St, North Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.