Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 16, 2022 at 8:00 PM
Updated October 24, 2023
Site work and new construction of a power facility in Antigonish, Nova Scotia. Completed plans call for the construction of a power facility; and for site work for a power facility.
The Alternative Resource Energy Authority (AREA) is overseeing the construction of a solar garden (solar PV facility) in each of the Towns of Antigonish, Berwick and Mahone Bay. Each solar garden will be connected to an existing distribution circuit within each of the Towns' distribution network. The Towns of Antigonish, Berwick and Mahone Bay each own and operate their own electric utility. The Town of Antigonish distribution network presently operates at 12.47kV, however, future plans are to convert the network to 24.94kV. The Town of Berwick distribution network presently operates at 12.47kV and the Town of Mahone Bay distribution network operates at 4.16kV. This Scope of Work is prepared to describe in detail the technical requirements to supply and install overhead line infrastructure as required to provide an interconnection (collector circuit) between the solar garden facility (padmount step-up transformer) and the point of interconnection with the Town's electric utility distribution circuit. In general, the Scope of Work should be considered generic for all three (3) solar garden collector circuits; with modifications being noted herein where the individual Collector Circuit design and/or equipment is specific only to that facility.
Post-Bid
Solar Power Generation
$1,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 18, 2022
June 17, 2022
Multiple Locations, Antigonish, NS
Related To This Project
Antigonish, NS
Bid Date: May 18 2022
Antigonish, NS
Bid Date: May 09 2022
Antigonish, NS
Bid Date: Apr 29 2022
Antigonish, NS
Bid Date: Nov 05 2021
Antigonish, NS
Bid Date: May 20 2022
Antigonish, NS
Bid Date: Apr 07 2021
Antigonish, NS
Bid Date: Jun 02 2022
Antigonish, NS
Bid Date: Mar 31 2022
Antigonish, NS
Bid Date: Apr 27 2022
Antigonish, NS
Bid Date: Apr 29 2022
Antigonish, NS
Bid Date: Apr 27 2022
Antigonish, NS
Bid Date: May 30 2022
Antigonish, NS
Bid Date: Nov 30 2022
Antigonish, NS
Bid Date: Jun 24 2022
Antigonish, NS
Bid Date: Feb 02 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed