Published January 9, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of a water / sewer project in Greenville, South Carolina. Completed plans call for the renovation of a water / sewer project.

The project generally consists of the replacement of 43 variable frequency drives (VFDs) located at six (6) Water Resource Recovery Facilities (Georges Creek, Gilder Creek, Lower Reedy, Mauldin Road, Pelham, and Piedmont Regional). The existing VFDs are installed on motors ranging in size from 8-HP to 75-HP. Liquidated Damages $500/day Project Duration 480 days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/22/2022 5:00 PM (EST)

Award

Water / Sewer

$1,090,584.00

Public - County

Renovation

53

8

4

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
117
Bidding Soon
1,265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

January 2, 2023

Project location map

Multiple Locations, Greenville, SC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed