BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Greenville, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Mauldin Road Water Resource Recovery Facility Juice Tank Rehabilitation Response Format Electronic Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum License Requirements WP Liquidated Damages $1000 per day Project Duration 270 Days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Electronic Q&A Yes Q&A Deadline 11/23/2022 5:00 PM (EST) The project generally consists of coating the existing juice tank with a high-performance coating, replacing the existing air operated diaphragm pumps in the digester building, instillation of a new juice force main, instillation of a new magnetic flow meter, instillation of a new level sensor, rehabilitating the suction line for the diaphragm pumps with CIPP liner, Electrical work and controls. 1. The construction and modifications consist of the following: a. Clearing and grubbing, civil/site work, etc. b. Conducting locate of existing subsurface utilities within the work areas. c. Juice tank coating and installation of handrails. d. Installation of level sensor and transmitter to measure juice tank water level. e. Construction of piping and accessories for a quick disconnect. f. Installation of cure-in-place pipe (CIPP) inside existing pipe from juice tank to diaphragm pumps. g. Piping modifications for inlet and outlet headers of diaphragm pumps. h. Replacing two (2) existing air operated diaphragm pumps in the digester building. i. Installation of magnetic flow meter on juice waste pumps discharge pipe. j. Construction of new force main to discharge juice waste to primary effluent diversion structure (PEDS). k. Electrical work and controls. l. Connecting control panels of new diaphragm pumps and instruments to plant SCADA; modify the connection of existing Primary Sludge Pumps (PSPs) to plant SCADA. 2. The Additive Alternate No.1 include the following: a. Installation of metal cover for the juice tank. b. Handrails around juice tank shall be removed from Contract if Additive Alternate No.1 is selected

Award

Water / Sewer

$1,448,535.00

Public - County

Renovation, Site Work

32

16

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
730
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.