Site work for a water / sewer project in Virginia Beach, Virginia. Completed plans call for site work for a water / sewer project.

Installation of 2700 If of 21" to 72" (equivalent) storm drain, 3000 If of 4" to 8" di water main, 300 If of 8" to 18" di sanitary force main, sanitary sewer laterals and cleanouts and asphalt pavement restoration The Owner will receive sealed bids for the furnishing of all equipment, labor and material, and the performing of all work for the above described project. Questions regarding the referenced bid documents should be submitted Matt Lehman at to Mlehman@vbgov.com. Small Business Enhancement Program This solicitation is subject to the requirements of the Small Business Enhancement Program (SBEP). As a matter of responsiveness, bidders that intend to subcontract work on the resulting project must commit at least fifty percent (50%) of the value of the subcontracted work to businesses certified as Small, Women-owned, and Minority-owned businesses (SWAM) by the Virginia Department of Small Business and Supplier Diversity; if the bidder is unable to meet the fifty percent (50%) subcontracting requirement, then the bidder must provide documentation showing, with specificity, good faith efforts undertaken to meet the fifty percent (50%) SWAMcertified subcontractor participation requirements. Minority-owned Business Project Goals Program This solicitation is subject to the requirements of the Minority-owned Business Project Goals Program. The City of Virginia Beach has established a Minority-Owned Business Enterprise (MBE) goal of 10.7% of the total value of the resulting project. As a matter of responsiveness, bidders must subcontract ___10.7_% of the total project value to businesses certified as Asian American-, Black American-, or Hispanic American-owned by the Virginia Department of Small Business and Supplier Diversity; if the bidder is unable to meet the MBE subcontracting goal, then the bidder must provide documentation showing, with specificity, good faith efforts undertaken to meet the MBE goal. The MBE goal can be met in conjunction with Small Business Enhancement Program requirements by subcontracting work to certified Asian American-, Black American-, or Hispanic American-owned SWAM businesses.

Award

Water / Sewer

$12,475,026.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
31
Bidding Soon
425
All Active Projects
142
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Virginia Beach, VA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.