BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Miami, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Miami-dade Road Name: Sr 90 (Sw 8th St) Limits: From W of Sw 74 Ct to W of 42 Ave, From E of Sw 42 Ave to E of Sw 27 Ave and at Sw 44 Ave Project(s): 44391715201 Federal Aid No: D622005B Project(s): 44391715202 Federal Aid No: D622005B Project(s): 44391815201 Federal Aid No: D622007B Project(s): 44391815202 Federal Aid No: D622007B Project(s): 44391825201 Federal Aid No: D622006B Project(s): 44391915201(*) Federal Aid No: D622004B Project(s): 44391915202 Federal Aid No: D622004B Project(s): 44391915601 Federal Aid No: N/A Project(s): 44391915602 Federal Aid No: N/A Total Roadway Length: 4.752 Miles Contract Days: 480 Total Bridge Length: 0.000 Miles Total Proposal Length: 4.752 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Calendar Days Incentive / Disincentive Flexible Start The improvements under this contract consist of resurfacing along SR 90 (SW 8th St.) and Pedestrian Safety Improvement For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 018 Resurfacing/Traffic Signals/Sidewalk

Award

Roads / Highways

$13,790,706.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
46
Bidding Soon
1,082
All Active Projects
484
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2022

June 3, 2022

img_map_placeholder

FL-90, Miami, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.