Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 5, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a sidewalk / parking lot in Miami, Florida. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of July 05, 2023, this project has been cancelled. No other information at this time. Work under this contract includes, but is not limited to the following: Furnishing all supervision, labor, required materials, equipment, tools and performing all operations necessary, including Maintenance of Traffic (MOT) to completely perform Emergency Sidewalk Repairs, pursuant to Mayor's, Governor's, or President Declaration of Emergency (Declaration of Emergency). The County, at its discretion, may award more than one contract based on the proposals received and the impacts of events associated with the Declaration of Emergency. Contractor must also: 1. Provide required documentation and detailed invoices that include digital photographs of before and after repairs along with GPS coordinates for each location. 2. Include repeated mobilization/demobilization, transportation, supervision, overhead, fuel, insurance, overtime and all other multipliers for direct and indirect costs with the repairs/replacements Detail Scope of Work may include reconstruction and/or repairs of existing bus shelters, curb ramps, curbs and/or gutters. Removal and disposal of various existing pavements, existing trees, tree roots, debris. Grading and preparation of subgrade, sodding. Adjustment of existing utility valve covers to new finished grade. One or a combination of more than one of the work described herein may be required to be performed at any given site. Contractor and all subcontractors, under this Contract, are prohibited from performing any work, other than specified in the Contract and/or directed by the Engineer, within the limits of the project site, without prior written notification to the Engineer. This includes any work for private or commercial entities Anticipated Start Date: 7/21/2023 ,Calendar Days for Project Completion: 540 DBE Participation Percentage: 10.65% License Requirements: Include with the bid submittal package, copies of certifications and documentations that demonstrate that at the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and these Solicitation and Contract Documents, the Bidder must hold a valid, current, and active
Final Planning
Sidewalks / Parking Lot
$878,310.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2023
January 5, 2024
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
Bid Date: Jun 08 2022
Miami, FL
Bid Date: Mar 24 2022
Miami, FL
Bid Date: May 25 2022
Miami, FL
Bid Date: May 25 2022
Miami, FL
Bid Date: May 17 2022
Miami, FL
--
Miami, FL
Bid Date: Jun 14 2022
Miami, FL
Bid Date: Jun 14 2022
Miami, FL
--
Miami, FL
Bid Date: May 12 2022
Miami, FL
Bid Date: May 10 2021
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Feb 14 2020
Miami, FL
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed