Site work and new construction of an educational facility in Leland, Iowa. Conceptual plans call for the construction of a educational facility.
https://globegazette.com/community/winnebago-county-environmental-education-center-groundbreaking-is-oct-10/article_94cd1361-e0bb-594d-abab-913af8b3a067.html - The official groundbreaking ceremony for Winnebago County's new environmental education center will be held at 11 a.m. on Oct. 10. It will be held at 41600 U.S. Highway 69, north of Leland. The Winnebago County Conservation Board and the Friends of Winnebago County Conservation Foundation made the joint announcement on Sept. 27. Members of the Conservation Board and the Foundation Board will be on hand to break the ground for the new center. Construction on the center is beginning after a four-year fundraising effort, although more money is still needed to complete the building project, as well as to purchase furnishings and exhibits for the new building. Construction will continue into next year, and should be finished by the end of 2023. The WCCB held its second bid letting on June 14, approved Kingland Construction Services' $2.297 million bid at its June board meeting, and signed the final bid contract at its July meeting. The building will be located on 325 acres of prairie wetlands. Fundraising for the center officially began in June 2018. At that time, based on construction estimates, the goal was to raise about $1.2 million dollars for the new building. By the end of 2020, that goal had been surpassed when bids were opened in January 2021, but COVID caused major supply disruptions and cost increases. As a result, bids were all 30%-40% higher than anticipated and had to be rejected. Over the next year, the WCCB made design adjustments to the building and raised more money before letting the project again this spring. The building will be 7,680 square feet on two levels. The main floor will feature 28-foot high vaulted ceilings, an exhibit area, a large program and meeting room with a kitchenette, and offices. The lower level will have a workshop and activity area as well as a meeting room, plus a walkout to the prairie. The building will meet ADA specifications for accessibility and the two levels will be connected by an elevator. The new center will contain exhibits and interactive displays that will help increase people's awareness and knowledge of natural resources. It will also be a central location for programs and school field trips, as well as a meeting spot for local groups and organizations and tourists. ___________________________________________________________________________________ A complete scope of work has not been established. As of April 25, 2022, this project is in the conceptual phase. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to March 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As of August 22, 2023, no new information available
Conceptual
Educational
$500,000.00
Public - County
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2023
To Be Determined, Leland, IA
Related To This Project
Leland, IA
Bid Date: Feb 21 2023
Leland, IA
Bid Date: Nov 16 2021
Leland, IA
Bid Date: Nov 21 2023
Leland, IA
Bid Date: Jan 17 2024
Leland, IA
Bid Date: Jan 17 2024
Leland, IA
Bid Date: Mar 12 2024
Leland, IA
--
Leland, IA
Bid Date: Nov 26 2024
Leland, IA
Bid Date: Apr 19 2022
Leland, IA
Bid Date: Oct 18 2022
Leland, IA
Bid Date: Oct 18 2022
Des Moines, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.