BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Palm Springs, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of June 28, 2022, project has not been awarded. It will be awarded on the 28th of July. The Work comprises traffic signal, street, and pavement marking improvements along Palm Canyon Drive from Tachevah Drive to Ramon Road. The project will include but is not necessarily limited to the construction of: traffic signal modifications, ADA ramps, curbs, gutters, cross gutters, drainage channels, AC pavement, signage and striping as detailed within the contract documents. The Engineers estimate is $3,500,000 to $3,850,000. The work shall be diligently prosecuted to completion before the expiration of: 140 working days. All questions about the meaning or intent of the Bid Documents are to be submitted in writing on the Questions tab within online. Questions submitted after 3:00 PM on May 18, 2022, will not be accepted. Answers to all questions will be released through online for all registered bidders to review. The Contractor shall possess a valid Class A Contractor's License for the State of California, at the time of submitting bids. Each bid shall be accompanied by an electronic copy to demonstrate proof of a certified or cashier's check or a Bid Bond in the amount of 10 percent (10%) of the total bid price, payable to the City of Palm Springs. The original will be collected from the apparent lowest responsive bidder and shall match the electronic copy. The Contractor shall pay the general prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations (DIR) of the State of California for the locality where the work is to be performed. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner using the DIR's electronic certified payroll reporting system. The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, and reject all other bids, as it may best serve the interest of the City. A retention on progress payments is withheld per the Special Provisions of the Contract Documents. The Contractor may elect to receive 100 percent of payments due, from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completion0 140 working days.

Bid Results

Roads / Highways

$3,807,125.00

Public - City

Paving, Site Work

44

12

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
1
Bidding Soon
848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

July 25, 2022

Project location map

Palm Canyon Dr, Palm Springs, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.