BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Farmington, Missouri. Completed plans call for the renovation of a detention facility; for site work for a detention facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project No- 2110100_FARM The project includes demolition of existing men's and women's showers, latrines and locker areas, including adjoining spaces for renovation and of new latrines, showers and locker areas. New finishes include resinous flooring and wall coverings, lay-in ceilings, and HPDE toilet and shower partitions. Replacement of the exterior paving at the rear entrance to remediate stormwater drainage issues. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. The Work consists of exterior maintenance and interior renovation of the existing Farmington Girardeau Readiness Center (RC). 1. The Work includes, but is not limited to, demolition of existing men's and women's showers, latrines and locker areas, including adjoining spaces for renovation and of new latrines, showers and locker areas. New finishes include resinous flooring and wall coverings, lay-in ceilings, and HPDE toilet and shower partitions. Replacement of the exterior paving at the rear entrance to remediate stormwater drainage issues. The deadline for technical questions was June 2nd, 2022 at noon

Award

Jails / Prisons

$428,929.00

Public - State/Provincial

Paving, Renovation, Site Work

20

22

2

8

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
44
Bidding Soon
813
All Active Projects
308
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2022

July 11, 2022

img_map_placeholder

1210 Morris St, Farmington, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.