Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 26, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Bloomville, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The right is reserved to reject any or all proposals, to waive informalities, or to accept any proposal that is deemed most favorable to Chatfield Township. All road construction materials must comply with the Ohio Department of Transportation Specifications. If Bid is accepted Chatfield Township Trustees will require that all road work is completed by September 15, 2022. The work for which proposals are invited will consist of 1.5" Surface Asphalt Overlay

Post-Bid

Roads / Highways

$165,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
153
Bidding Soon
2,515
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

June 16, 2022

Project location map

Multiple Locations, Bloomville, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed