BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated October 24, 2023

Site work and new construction of a pre-engineered storage facility in Saguache, Colorado. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of May 19, 2022, no bids received. No definite date for the rebid County Public Health is seeking sealed bids for the following: 12 x 16shed with the following: 8 ft side walls 6ft double steel doors Floor insulation Hang sheetrock Floor to ceiling shelfing 3 feet in depth on two walls Shingle roof

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$530,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
12
Bidding Soon
218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2022

November 18, 2022

Project location map

To Be Determined, Saguache, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.