BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 17, 2022 at 8:00 PM

Updated July 22, 2025

Site work and paving for a mixed-use development in Kirkland, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project includes pavement removal, new hot-mix asphalt paving, storm sewer installation, sidewalk removal and replacement, curb & gutter, traffic control, and other related appurtenances within the Village limits. The project is approximately 11,500 feet of roadway reconstruction and approximately 3,300 feet of storm sewer installation. Upon accessing the website, Bidders will see a pull-down menu under "Connect". Select "Bidding Documents". Clicking this link will take Bidders to the Quest Network Service and will display all projects available for bid through Fehr Graham. On this page, projects will be listed with project numbers assigned by Quest displayed. Potential Bidders can enter the Quest project number 8187831 in the field provided to view the full ad for the Village of Kirkland - 2022. Please contact QuestCDN at (952) 233-1632 or at info@questcdn.com for assistance in free membership registration, downloading, and working with this digital project information. Overnight mailing of Bidding Documents will not be provided. The work is located within the boundaries of the Village of Kirkland, Illinois. The project includes pavement removal, new hot-mix asphalt paving, storm sewer removal and installation, sidewalk removal and replacement, curb and gutter installation, traffic control, restoration, and other related work within the Village limits. The project is located on the following streets: - West South Street from South 6th Street to 1st Street - West Prairie Street from South 6th Street to South 3rd Street - West Prospect Street from South 6th Street to South 4th Street - West Benham Street from South 5th Street to South 3rd Street - Hortense Drive from Bull Run Creek to 1st Street -South 5th - 2nd Street from IL-72 to West South Street The following project work shall be substantially completed on or before October 31, 2022. Contractor shall then have 20 days to address any punch list items and be prepared for final completion of project by November 20, 2022. The project is anticipated to be awarded by the Village of Kirkland on May 2, 2022, with Notice of Award to follow.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

86

4

4

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
524
Active Projects
281
Bidding Soon
5,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 13, 2022

Project location map

Multiple Locations, Kirkland, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.