EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 27, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a detention facility in Tiptonville, Tennessee. Completed plans call for the renovation of a detention facility.

New cameras on poles will be installed around the perimeter of Northwest Correctional Complex. The Owner reserves the right to waive informalities and to reject bids. Question Deadline 12/10/2024 Bidders shall submit questions about Bidding Documents to Designer in writing Questions must be received by Designer at least six calendar days before bid due date. The project consists of furnishing and installing cameras, fiber cabling, CAT6 cabling, switches, conduit, and fiber network switches as components for the new Camera system as defined in the Project Manual. The contractor shall furnish and install UPS, Make Before Break Bypass Switch, and Surge Suppression for the additional UPS units. Ongoing services and installations under separate contracts shall be verified and coordinated prior to construction. In any case of error, omission, discrepancy, or lack of clarity, the deficiency shall be identified and brought to the attention of the Project Engineer for proper clarification prior to the bid due date. C. The existing Camera and UPS system will remain operational during the installation of the new system. D. The status of existing Camera and UPS system shall be documented prior to beginning modifications and interfaces with other systems that are part of this project. The new system shall be networked and constructed such that it functions as a single integrated system.

Bid Results

Jails / Prisons

$1,940,000.00

Public - State/Provincial

Renovation

8

13

9

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Maintenance Data, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Floor Plates
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Uninterruptible Power Supply, Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
26
Bidding Soon
300
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

January 17, 2025

img_map_placeholder

960 TN-212, Tiptonville, TN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

NWCX Security Electronics Refresh - Camera Perimeter Northwest Correctional Complex

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.