Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Tacoma, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Description of Work: This con-tract provides for the resurfacing of: Group 1 - McCutcheon Road East (Canyon Falls Creek to Fennel Creek) (Base Bid) This work provides for resurfacing approximately 1.52 lane miles of McCutcheon Road East by resur-facing th.e roadway with Not Mix Asphalt. Group 2 - Sumner Tapps Highway East (250' NE/0 West Tapps Drive East to 16th Street East) (Additive Bid) This work provides for resurfac-ing approximately 1.2 lane miles of Sumner Tapps Highway East by resurfacing the roadway with Hot Mix Asphalt. Group 3 C Street South (112th Street South to Park Avenue South) (Additive Bid) This work provides for resurfacing approximately 0.54 lane miles of C Street South by resurfacing the roadway with Hot Mix Asphalt. Group 4 - Park Avenue South (C Street South to Yakima Avenue South) (Additive Bid) This work pro-vides for resurfacing approximate-ly 2.49 lane miles of Park Avenue South by resurfacing the roadway with Hot Mix Asphalt. Group 5 - Yakima Avenue South (Park Avenue South to 96th Street South) (Additive Bid) This work provides for resur-facing approximately 0.33 lane miles of 'Yakima Avenue South by resurfacing the roadway with Hot; Mix Asphalt. Group 6 - 120th Street East (300' DO 198th Avenue East to South Prairie Road East) (Additive Bid) This work pro-vides for resurfacing approximate-ly 4.88 lane miles of 120th Street East by resurfacing the roadway with Hot: Mix Asphalt. Group 7 152nd Street East (SR 161 to 250' EIO 118th Avenue Court East) (Additive Bid) This work provides for resur-facing approximately 2.78 lane miles of 152nd Street East by resurfacing the roadway with Hot Mix Asphalt.. Group 8 -Waller Road East (72nd Street East to 400' S/O Pioneer Way East) (Additive Bid) This work provides for resurfacing approximately 5.1 lane miles of 'Waller Road East by resurfacing the roadway with Hot Mix Asphalt. Group 9 -Carbonado-Wilkeson Road (AP Tubbs Road East to Town Limits) (Additive Bid) This work pro-vides for resurfacing approximate-ly 0.4 lane m.iles of Carbonado-Wilkeson Road by resurfacing the roadway with Hot Mix Asphalt. Cost Range: $3,000,000 TO $5,000,000 Working Days: 85 and Utility Relocation Window Days: 0 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$3,651,563.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2022
June 3, 2022
Multiple Locations, Tacoma, WA
Related To This Project
Tacoma, WA
--
Tacoma, WA
Bid Date: Dec 30 2021
Tacoma, WA
Bid Date: Dec 16 2021
Tacoma, WA
Bid Date: May 19 2022
Tacoma, WA
Bid Date: Apr 19 2022
Tacoma, WA
Bid Date: Apr 06 2022
Building 326 Storefront Window Replacement, Partition Bracing and Isolated Siding Painting - 4661087
Tacoma, WA
Bid Date: Apr 20 2022
Tacoma, WA
Bid Date: Mar 18 2022
Tacoma, WA
Bid Date: May 13 2022
Tacoma, WA
Bid Date: May 13 2022
Tacoma, WA
Bid Date: May 13 2022
Tacoma, WA
--
Tacoma, WA
Bid Date: May 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.