BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Detroit, Michigan. Completed plans call for site work for a bridge / tunnel; and road / highway.

Soliciting bids from general contractors, construction managers and other businesses that meet the qualifications set forth herein for the installation of bird netting and cleaning/removal of existing bird droppings underneath the bridge structure at the McNamara Terminal Arrivals Level curbside and adjacent roadway at Detroit Metropolitan Wayne County Airport. PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND: The Contractor shall furnish an AIA 311 Performance Bond and an AIA 311 Labor and Material Payment Bond (AIA 312 forms will not be accepted). Both Bonds shall be in an amount equal to 100% of the Contract Sum and shall comply with the requirements set forth in Article 10 of the General Terms and Conditions. PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND: The Contractor shall furnish an AIA 311 Performance Bond and an AIA 311 Labor and Material Payment Bond (AIA 312 forms will not be accepted). Both Bonds shall be in an amount equal to 100% of the Contract Sum and shall comply with the requirements set forth in Article 10 of the General Terms and Conditions. Substantial Completion of Construction - shall be achieved within 60 calendar days of the NTP for construction. The number of days that vehicle lanes are barricaded and work activity at the site is occurring shall not exceed 30 days (an average of 10 days for each of the three phase shown on the Drawings. Once Substantial Completion of the construction work has been achieved, the Contractor shall remove all equipment and temporary traffic control devices from the site. Final Completion - Construction work including all restoration, cleanup, completion of punch list and removal of temporary traffic control and safety devices shall be no later than 30 calendar days after the Substantial Completion date. Construction will not be considered to be complete unless all project construction tasks are completed. Final Completion and submittal of Final Contractor's Pay Application to the Airport Authority shall be completed no later than 60 calendar days after Substantial Completion date. All questions regarding this RFB must be submitted to the Procurement Contact at the above number and email address. Contact concerning this RFB with any other employee, officer or Board Member of the Airport Authority is not permitted during the solicitation process. Pre-Bid Question Deadline August 16, 2022 2:00 PM Eastern Time CANCELLATION OF RFB The Airport Authority reserves the right to cancel this solicitation, in whole or in part, as well as reject any or all bids, or to accept or reject any bid in part, and to waive any minor informality or irregularity in bids received if it is determined by the Chief Executive Officer (CEO) or his designee that the best interest of the Airport Authority will be served by so doing. If the solicitation is cancelled or all bids are rejected by the Airport Authority.

Post-Bid

Bridges / Tunnels

$50,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
76
Bidding Soon
1,388
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2022

September 21, 2022

img_map_placeholder

1 Detroit Metro Airport, Detroit, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.