Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2025 at 7:00 PM
Updated January 30, 2025
Site work for a playground / park / athletic field in North Port, Florida. Working plans call for site work for a playground / park / athletic field.
The owner has determined a prequalified list of construction managers. Question Deadline 11/18/2024 The last day for questions. Scope of Services: The scope of work is a general guide to the work the City expects to be performed by the Consultant and is not a complete listing of all services that may be required or desired. Warm Mineral Springs Historic Renovation, Floodproofing, and Site Improvements will include: Building A: Conditioned space for Admissions staff, staff restrooms, and a meeting room in a wet floodproofed condition. Building B: Removal of formerly programmed interior space to provide family-style rooms and a shaded area for public gathering. Building C: The Cyclorama will be 'mothballed' consistent with historic guidelines, the roof replaced and the facility wet floodproofed. Site improvements will include open-air shower towers, and various other improvements, the extent of which will largely be determined by the scale of the project, zoning requirements and budget constraints. Water/wastewater services connecting near US 41 through Ortiz Boulevard The three (3) existing buildings will be renovated to varying levels, and each wet floodproofed. The CMaR will work with the City of North Port Engineer of Record (EOR), Kimley-Horn, and Architect of Record (AOR), Sweet Sparkman Architects, to establish a building program which will allow the City of North Port to remain within the allocated project budget. CMaR may be called upon to assist with and/or prepare exhibits as needed, and present to City Commission. Background: The City will not respond to oral inquiries. Proposers may submit written inquiries via e-mail regarding this RFP to to Purchasing@northportfl.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Playgrounds / Parks / Athletic Fields
$14,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2024
August 4, 2025
12200 San Servando Ave, North Port, FL
Related To This Project
North Port, FL
Bid Date: Oct 06 2020
North Port, FL
Bid Date: Sep 14 2022
North Port, FL
Bid Date: Sep 20 2021
North Port, FL
Bid Date: Sep 23 2022
North Port, FL
--
North Port, FL
Bid Date: Jun 24 2022
North Port, FL
Bid Date: Aug 24 2022
North Port, FL
Bid Date: Sep 27 2018
North Port, FL
Bid Date: Sep 10 2019
North Port, FL
Bid Date: May 16 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
