Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Cedar City, Utah. Working plans call for the construction of a fire / police facility; for site work for a fire / police facility; detention facility; detention facility; parking garage; parking garage; sidewalk / parking lot; for paving for a sidewalk / parking lot; warehouse / distribution facility; and warehouse / distribution facility.
As of February 28, 2024, a construction manager/general contractor and an architect has been selected but the project is on hold due to funding. A construction timeline is not available. *The closed solicitation has been included below for reference: Request for Proposal (RFP) Construction Management/General Contractor Services for a New Iron County Jail & Sheriff's Complex GENERAL OVERVIEW AND DESCRIPTION OF PROJECT OBJECTIVE Iron County is seeking to hire a qualified and motivated firm to provide construction management/general contractor services for new Iron County Jail and Sheriff's Office Complex to be located at Canyon Ranch Drive (North East of the North Freeway Interchange), Cedar City, Utah. The new facilities are to include: 1) Jail 2) Attached Sheriff's Offices 3) Detached Outbuildings including possible Storage/Armory Building 4) Vehicle Garage 5) Parking lot Access Roads, and 7) Landscaping. County officials have chosen the much lauded Podular design for inmate housing quarters due to its many advantages and efficiencies of securely managing inmates. Iron County plans to build at this time one (1) inmate pod. However, in anticipation of future expansion, the Sheriff's Offices and common support functions (kitchen, laundry, etc.) will be built large enough to support two full (2) inmate pods, with minimal upgrades. This will allow for maximum flexibility for the addition of a second inmate pod in the future as needs require without remodeling the entire facility. Iron County expects that the facility will meet a high standard for energy efficient features and landscaping and will utilize sustainable building principles and features. The facility will reflect modern and otherwise low-impact aesthetics and will be a cost conscious project. Iron County is sensitive to the desires of the surrounding community and seeks to achieve a design that will be conducive to nearby commercial and residential development(s) with no negative impact from a nearby correctional facility. Simply put, the building will be safe and effective in its primary purpose as a correctional facility yet will appear very much like a modern office-like complex. The building will emit very limited levels of light and sound and will be a safe, efficient, and responsible neighbor to the surrounding community. Iron County projects a total construction budget of about $45-50 million. Iron County has agreed to administer the design, funding, construction, maintenance and operation of the facility. Identify submission as "Iron County Jail". The entire submittal should not exceed twenty-seven (27) pages in length. In addition, the CM/GC may submit a brochure describing the capabilities of their firm.For full information regarding this rfp or contact the primary contact below for complete instructions dan jessen, county auditor, will be the primary contact for interested cm/gc's in fulfilling the work described in this rfp. Mr. Jessen can be reached at: 68 south 100 east parowan, utah 84761. Telephone (435) 477-8331, and email address: djessen@ironcounty.Net pub#5236378 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Any and all questions regarding this RFP should only be submitted via email no later than 5:00 p.m. MST on Monday, May 10, 2022.
Pre-Construction/Negotiated
Fire / Police
$82,000,000.00
Public - County
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2022
July 8, 2024
Canyon Ranch Dr, Cedar City, UT
Related To This Project
Cedar City, UT
Bid Date: Dec 09 2021
Cedar City, UT
Bid Date: May 04 2022
Cedar City, UT
Bid Date: May 04 2022
Cedar City, UT
Bid Date: Apr 01 2022
Cedar City, UT
Bid Date: Apr 01 2022
Cedar City, UT
Bid Date: Apr 25 2022
Cedar City, UT
Bid Date: May 06 2022
Cedar City, UT
Bid Date: May 31 2023
Cedar City, UT
Bid Date: Sep 29 2021
Cedar City, UT
Bid Date: Mar 18 2022
Cedar City, UT
Bid Date: Apr 15 2022
Cedar City, UT
Bid Date: May 02 2022
Cedar City, UT
Bid Date: May 02 2022
Cedar City, UT
Bid Date: Apr 28 2022
Cedar City, UT
Bid Date: Apr 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.