EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 25, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of an educational facility in Baton Rouge, Louisiana. Working plans call for the renovation of a educational facility.

**As of October 25th, 2023 - the bids from this project's September 26th rebid have all been rejected and this project will rebid in the future.** The successful Bidder is allowed 120 calendar days to complete the Project from the commencement date stated in the Agreement or a Notice to Proceed. Liquidated damages will be assessed at $1,000.00 for each consecutive calendar day for which the work is not substantially complete and $1,000.00 for each consecutive calendar day beginning the 46th day after the date of Substantial Completion for which all punch list work is not complete. Bids must be accompanied by a bid security equal to five percent (5%) of the base bid and include all additive alternates in the form of a certified check, cashiers check or bid bond. A bid bond shall be written by a company that complies with the provisions of La. R.S. 38:2218C. The successful bidder is required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the contract amount and a Payment Bond in an amount equal to one hundred percent (100%) of the contract amount written by a company that complies with the provisions of La. R.S. 38:2219. Minority, female-owned, and Section 3 contracting firms are encouraged to submit bids. The apparent low bidder must complete and deliver to Southern University at the address stated above within ten (10) calendar days after the date of the opening of the Bids- the sworn affidavit required to comply with La. R.S. 38:2212.10 regarding an employee status verification system, the signed no conviction affidavit required by La. R.S. 38:2227, the non-collusion affidavit required by La. R.S. 38:2224, the anti-lobbying certificate, and other required documents as specified in the Bidding Documents. No bid may be withdrawn for a period of 45 days after the date of the bid opening except as provided by law. Bidders must meet the requirements of the State of Louisiana Contractors Licensing Law, R.S. 37:2151 et seq. NOTE: Bids shall only be accepted from contractors who are licensed under louisiana contractors licensing law for the major classification of building construction. The award of a contract for this advertisement and continuation of such a contract is contingent upon Southern University obtaining sufficient financing to fulfill the requirement of the contract as applicable. If Southern University is unable to obtain sufficient financing to complete this contract, the contract shall be cancelled or terminated. The Owner reserves the right to reject any and all bids for just cause. The Available Funds for Construction (AFC) is One Million Dollars ($1,000,000.00) in accordance with La. R.S. 38:2212(A)(1)(b), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity. This value is for the base bid and not inclusive of any alternates. Southern University reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities.

Final Planning

Educational

$100,000.00

Public - State/Provincial

Renovation

34

16

6

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Quality Control, Testing and Inspecting Services, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roof and Wall Specialties and Accessories, Roof Accessories, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Entrances and Storefronts, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Refrigerant Piping, Refrigerants
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Plants, Shrubs, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
47
Bidding Soon
543
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2022

April 25, 2024

img_map_placeholder

801 Harding Blvd, Baton Rouge, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.