Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 6, 2022 at 7:00 PM
Updated September 15, 2023
Site work and paving for a civil project in Avon Park, Florida. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of December 6, 2022, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 01 Selection Method : Letter of Response and Abbreviated Technical Proposal Professional Liability Insurance : $250,000.00 SR 700 (US 98) From E of Floral Dr to N of Bridge 090032 TRC Members (Subject to Change) : Randy Lachler Ryan Weeks Stacy Hill Financial Management Number(s) 44893613201 44893613202 Longlist Date/Time 5/31/2022 10:30 pm Shortlist Selection Date/Time 6/07/2022 07:00 pm Phase II Submittal Deadline Date/Time 6/22/2022 12:30 am Final Selection Date/Time 7/12/2022 07:00 pm Negotiations Period Begin Date 7/20/2022 Negotiations Period Ending Date 9/01/2022 The method of contractor selection has not been determined at this time. FDOT - RFP - SR 700 (US 98) From E of Floral Dr to N of Bridge 090032
Conceptual
Bridges / Tunnels
$7,801,647.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
FL-700, Avon Park, FL
Related To This Project
Avon Park, FL
Bid Date: Mar 21 2024
Avon Park, FL
--
Avon Park, FL
--
Avon Park, FL
--
Avon Park, FL
--
Avon Park, FL
Bid Date: Jan 27 2023
Avon Park, FL
Bid Date: Jan 10 2023
Avon Park, FL
--
Avon Park, FL
Bid Date: Feb 16 2023
Avon Park, FL
Bid Date: Oct 03 2022
Avon Park, FL
--
Avon Park, FL
Bid Date: Apr 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
