BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fontana, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of August 22, 2022, the project has been awarded. A timeline for construction has not been confirmed. The general items of work to be done consists of removing an existing traffic signal and its facilities, installing new traffic signal poles, mast arms, emergency vehicle detectors, battery back-up system, control assemblies, pull boxes, pole foundations, conduit undergrounding, access ramp improvements, AC paving, signing and striping, as well as performing video inspection of sewer, installing curb opening catch basins, reinforced concrete pipes, restoring all improvements to preconstruction conditions, and all related work required as indicated on the project plans for the N. Cherry Avenue at Live Oak Avenue Traffic Signal Modification Project. Online Q&A : Yes Q&A Deadline : 05/28/2022 2:00 PM (PDT) Liquidated Damages : $1,500 per Calendar Day Type of Award Lump Sum This project is located at the existing signalized intersection of North Cherry Avenue and Live Oak Avenue in Fontana, CA 92337. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$876,055.00

Public - City

Paving, Site Work

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
485
Active Projects
218
Bidding Soon
3,622
All Active Projects
1,652
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 2, 2022

July 4, 2022

img_map_placeholder

Cherry Ave & Live Oak Ave, Fontana, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.