BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Santa Ana, California. Completed plans call for the renovation of a municipal facility.

Judicial Council of California ("Council"), chaired by the Chief Justice of California, is the primary policy making body of the California judicial system. The Council is supported by an administrative agency also called Judicial Council of California ("Judicial Council"). Judicial Council issues this Request for Qualifications to Prequalify General Contractors as Prospective Bidders ("RFQ") for the Fire Life Safety Building Deficiency Corrections, Floors 1, 2 and 3 Project, as further described in the "Project Description" section below ("Project"). Purpose / Eligibility. Through this RFQ, Judicial Council invites the submission of Submittal Packages (as defined below) from appropriately licensed general contractors ("Contractor(s)") to prequalify as eligible to submit a bid to perform construction services for the Project. The Submittal Package includes the prequalification questionnaire attached hereto as Attachment 1 ("Prequalification Questionnaire") and financial statements / information requested therein. Contractors will NOT be submitting a bid in response to this RFQ. Judicial Council will prequalify Contractors who satisfy the minimum scoring requirements to prequalify as set forth in Attachment 2 ("Prequalification Scoring") ("Prequalified Contractor(s)"). Judicial Council will then issue an Invitation to Bid that includes the project manual and bid documents ("Project Manual"), to Prequalified Contractors inviting the submission of bids. Estimated Construction Cost. The total estimated cost to construct the Project is $60,000,000.00. Estimated Construction Timeline.The Judicial Council anticipates issuing a notice to proceed for construction of the Project in or about July 2022.The Project has an anticipated duration of 1095 calendar days. Required Licenses.The Project requires that the selected Contractor maintain one or more of the following State of California Contractor Licenses: (i) C-22 (Asbestos Abatement); (ii) B (General Building Contractor); and (iii) C-16 (Fire Protection).

Award

Municipal

$60,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

28

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
107
Bidding Soon
2,369
All Active Projects
1,036
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2022

January 13, 2023

img_map_placeholder

700 W Civic Center Dr, Santa Ana, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.